NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/None
Document / 2 pages

Letter regarding generator load test and costs, July 1999

Machine-extracted title · confidence 85%

Correspondence detailing payment for emergency generator load testing at 7 World Trade Center.

NYC-WTC_000172572–000172573

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172572
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document PAGE 2/3 ,UL-20-89 09:48 FROM:SILVERSTEIN PROPERTIES ID: 212732120607 we ” von * DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES DIVISION OF REAL ESTATE SERVICES MUNICIPAL BUILDING, 20% Floor - Roen: 2053 NEW YORK, NLY. 10007 (712) 669-3645 = Far (212) 669-2666 WILLIAM J. DIAMOND LORI FIERSTEIN Connsissigucr Deputy Commixsicaer BY HAND DRAFT Inly 8, 1999 TVR $2. pif ent (“MOEM”) Deat ™ our mutually - ped wh 25, 1998 (the “Teas York, as Tenant, - scree _ \Gh 9, 1999 letter er ARIS. Al terms used in this letter, _~ pyvous neTeot, have the same meammng ascribed to them in the Lease. -1. Tenant shall, within thirty (30) days after the execution of this letter agreement and the . Landlord’s invoice (annexed hereto as Exhibit A), pay to Landlord the sum of ; $1,884,322.00 representing a portion of the Work Cost in excess-of Landlord’ Ss Contribution (“Excess Work Cost”). Ruqueh 282, \ and efficient operation of the Siengency floor are vital to the effective operation of the MOEM. The emergency generators iil unde go a so-called complete “black-out a stimulation load test” on or about , 1999 999 "tne quckeesiul vompictionofenidtest ; , (performance per the plans and specifications), as determined by HO Penn, Consenti x - of Citywide ae, Services, ** Pras pea bee? Is Tommasi? prone’ arte —§ plies ts PRASFO-He-,) peer CaO | cf cath dist: «TER the. event Soni 2 St is Not Comp le Rd Svcc€S a LP , OF nePrn tars Ne CeSssary For He Sake and eVRiuent otetahion aw Benerators installed on the seventh CACC LT TE Netcrdee » 3. Tenant shall, within forty-five (45) days after completion of all outstanding work, cfEeer fig 2 including, without limitation, the punch-list (annexed hereto as Exhibit B) and change 4é eAPcee ot ee orders, pay Landlord the balance of the then Exeess Work Cost, except that Tenant PA Hea Gere s+ 5. uy withhold the sum of $400,000.00 from the payment of such Excess Work Cost until the date Landlord has de th Port Authe fis t# Land lov HL BeOmphly, perworm, Phe Ve pater Cottections ete. —— fave ‘*d Tete eaa PTF Tt ARUN icone a NYC-WTC_000172572

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172572Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →