NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/BUREAU OF SPACE DESIGN CONSTRUCTION COST ESTIMATE
Document / 1 page

WTC space design cost estimate addendum, May 1998

Machine-extracted title · confidence 92%

Department of General Services addendum estimating construction costs for the Office of Emergency Management at the World Trade Center.

NYC-WTC_000172478

Folder label: “BUREAU OF SPACE DESIGN CONSTRUCTION COST ESTIMATE

Page image
Scanned page image, NYC-WTC_000172478
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SENT BYi vetti FX 2100.. ; 5-14-98 I 8:31 121266g4107-» .89M8762;# 2

DEPARTMENT OF GENERAL SERVICES DIVISION OF REAL ESTATE SERVICES ADDENDUM #1 LEASING. ACQUISITIONS AND SPACE DESIGN TRAPS; Iron &■ Steel- J^CIPAl,BUlU)INO.20thHw -RoemSOflON NEW YORK, N.Y. J0007 . (212)fi69.2420 WnilAM X DIAMOND IJOSIEZBSSIBIN JErmVKKONDRAT . • Comnisflantr Acting CSanontttlener Assbtant Commitsieiur

BUREAU OF SPACE DESIGN Data 5/27/98 CONSTRUCTION COST ESTIMATE NYC AGENCY Mayor's Office_______ _

AGENCY PROGRAM Office of Emergency Management ____ PROJECT# 96-1346 PROJECT ADDRESS ? World Trade Center, New York, NY 10048

RENTABLE SQUARE FOOTAGE FLOORS

• . LANDLORD'S CONTACT.KathyGiJJ^erti PHONE# 212-406-4020 LANDLORD Silverstein Properties. Inc.

LANDLORD'S ADDRESS 120 Broadway , New York, NY 10175

ARCHITECTS CONTACT Joe Allotta PHONE# 212-219-0059

ARCHITECT Swanke Hayden Connell Ltd. ARCHITECTS ADDRESS 295 Lafayette Street, New York, NY 10012

ENGINEERS CONTACT Michael Maybaum PHONE # 212-615-3606

ENGINEER Cosentini Associates LLP

ENGINEER'S ADDRESS, 2 Penn Plaza, NY, NY 10121 PHONE#

LOW BIDDER'S CONTACT. Steve Glazer . PHONE# 718-782-4844

LOWBIDDER Newco Ironworks, Ltd... LOW BIDDER'S ADDRESS 68 North 1st Street, Brooklyn,NY 11211

Use this section only If there Is a general subcontractor.

1. ALL AMOUNTS TO BE ROUNDED TO DOLLAR AMOUNTS 2. INDICATE QUANTITIES AND UNIT PRICES WHERE INDICATED a. ATTACH BACK-UP PAGES IN THE SAME FORMAT FOR ITEMS OF WORK NOT INCLUDED IN THE COST ESTIMATE FORM 4. THIS COST ESTIMATE IS TO BE USED TO DEVELOP AN OVERALL COST COST FOR THE WORK AS INDICATED AND/OR REQUIRED OR IMPLIED BY THE DRAWINGS AND SPECIFICATIONS EXCEPT IT WILL ALSO BE USED AS A BASIS FOR ESTABLISHING UNIT COSTS FOR DELETING . 1 AND ADDING ITEMS OF WORK ROftD Wl! I NFGOTIATF nn.<5TA IT nFPM.C Tn RF — NYC-WTC_000172478

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172478Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Construction Cost Estimate Form, May 1998 · Box 7DCAS

NYC-WTC_000172639

Department of General Services form estimating costs for drywall and carpentry work at the World Trade Center for the Mayor's Office.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
Flooring cost estimate, May 1998 · Box 7DCAS

NYC-WTC_000172719

Bureau of Space Design form estimating floor, base, and carpet costs for the Mayor's Office of Emergency Management at the World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.967

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →