NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/None
Document / 1 page

Ambassador Construction estimate for door and fuel floor work, 7

Machine-extracted title · confidence 90%

Estimate for usable lid installation and rolling fuel oil floor work at 7 World Trade Center.

NYC-WTC_000172443

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172443
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document AMBASSADOR CONSTRUCTION COMPANY, INC. 317 MADISON AVENUE, NEW YORK, N.Y. 10017 TEL. (212) 922-1020 FAX: (212) 949-9762 ESTIMATE DATE _ is/20/se SUB-CONTRACTOR LOmCARn# Doon PROJECT MATO"L OER TRADE _ Fine Doon LOCATION Z WTC PHONE NO.. 7840338373 SUBS ESTIMATOR ROG MANSH FLOOR ESTIMATED FOR. J.K ARCHITECT DWG. NO. LATEST DATE WORK INCLUDED: LUSABLE LIDK 8X8 VInEROOI ROLLIDG @FUEL OIL E FLOOR WORK NOT INCLUDED OR ALTERNATES: TOTAL PRICE _ 12250 33847 REMARKS: NYC-WTC_000172443

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172443Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →