... Page 2
Re: Mayor’s Office / Emergency Management PJEst# 98-0431
7 World Trade Center - Various Floors
The following items are not included:
- Fireproofing & Protection
- Disconnect switches
- Window Work
- Furnish Smoke Detectors
“ Duct cleaning
- Plumbing & Sprinkler Work
’ Fumish/Install Fire/Smoke Detection System
- Asbestos abatement and related work
- Drain down & Refill existing Piping/Risers
- Perimeter Induction Work
- Excavation and Backfilling
- Concrete Work - Housekeeping Pads
- Structural and Dunnage Steel
- Roof Work (Ind. Pitch Pockets)
- Flashing & Waterproofing
- Chopping of concrete slabs or walls
- Preventive Maintenance/Emergency Service
- Replacement parts for existing equipment
- Scaffolding
If there is any question regarding this matter, please call our office.
We thank you for your interest in our product and services.
Fax cover sheet from an air conditioning contractor regarding a pricing estimate for the Mayor's Office of Emergency Management at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
Fax cover sheet from an air conditioning contractor regarding a pricing estimate for the Mayor's Office of Emergency Management at 7 World Trade Center.
Department of Citywide Administrative Services approves architectural and engineering services proposal for the Mayor's Office of Emergency Management at 7 World Trade Center.
Fax cover sheet from an air conditioning contractor regarding a pricing estimate for the Mayor's Office of Emergency Management at 7 World Trade Center.