MAR 17- ’99 Id:27 FR AMBASSADOR CONSTR. C0212 949 9762 TO 6693640 P.03/03
AMBASSADOR CONSTRUCTION CO., INC.
March 17.1999
Mr. Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10048
RE: Mayor s Office of Emergency Management
7 World Trade Center -1, 7 & 23rd Floors
Change Order #076
AmbU[flJ!lJL.S57^175
Dear Mr. Weems:
We are pleased to submit herewith our change order #076 to perform the following work at
the above referenced premises for the sum of SEVEN HUNDRED ONE DOLLARS
($701.00):
SCOPE OF WORK
- Relocate existing cold water make-up line which interfered with
the location of the Motorola riser work as requested by Silverstein
Building Engineers. This work was performed on a time and material
basis. Plumbing $606,00
General Conditions 48.00
Overhead & Fee 39.00
Insurance 9.00
Total $701.00
Please notify us if we are to proceed with this work.
Very truly yours,
AMBASSADOR CONSTRUC^N CO.. INC.
Martin Schneider
Vice President
MS;am
cc: Juan Mejia - SHC
Glenn Pymento - DCAS
Accepted:_________ Dated:
C:<O^FCi«N#WIMiMraCK1OCUCO SVOCMCDTe
317 MADISON AVENUE ■ NEW YORK, NY 10017 • 212 922 1020 • FAX 212 949 9762
** TOTAL PAGE.03 **
NYC-WTC_000171653