NYC-WTC_000171375
Work authorization for non-union electrician labor and materials at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗Authorization for additional work to relocate an electrical outlet on the 23rd floor of 7 World Trade Center.
NYC-WTC_000171467Folder label: “Work Order®7 W. T. C.®23rd Floor®Relocate 1 outlet”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
HUUtHI H. bAMUtLb, INO. TO; 352 PARK AVENUE SOUTH WORK ORDER NEW YORK, NY 10010 RBS ORDER NO. 26345 RBS JOB NO. INVOICE TO: S /, CUSTOMER JOB NO. CUSTOMER W.O. NO. CUSTOMER P.O. NO. JOB LOCATION 7 7^ 4: /
ATTENTION:
YOU ARE HEREBY AUTHORIZED AND REQUESTED TO PERFORM THE ADDITIONAL WORK SPECIFIED BELOW UPON THE FOLLOWING BASIS: COST OF ALL MATERIAL AND LABOR. INCLUDING ALL PREMIUMS ON INSURANCE AND FRINGE BENEFITS. PLUS OVERHEAD. PROFIT AND SALES TAX WHERE APPLICABLE. TERMS NET 15 DAYS.
CONTRACT EXTRA T& M SERVICE CALL
DATE AUTHORIZATION TO PROCEED PLEASE PRINT NAME
TIME AND MATERIAL WORK PURSUANT TO AND UNDER PROVISION OF ABOVE WORK ORDER. LABOR
MON. TUES. WED. THURS. FRI. SAT. SUN. GRAND DATE TOTAL No. Total No. Total No. Total No. Total No. Total No. Total No. Total HOURS Merii Hrs. Men Hrs. Men Hrs. Men Hrs. Men Hrs. Men Hrs. Men Hrs. S/T FOREMAN 0/T S/T SUB-FOREMAN O/T S/T / JOURNEYMAN O/T S/T O/T
DATE ACCEPTED:
5 NAME COMPANY
BY: PLEASE PRINT
BY________________ FOREMAN — PLEASE PRINT AUTHORIZED SIGNATURE LIST MATERIAL ON REVERSE SIDE WO-1 CONTRACT COPY NYC-WfC_00W 1467
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000171375
Work authorization for non-union electrician labor and materials at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171386
Work order authorization from R.B. Samuels for additional construction work at 7 World Trade Center with cost basis including materials and labor.
1 shared topics · Same agency, volume and box · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171381
Work authorization for additional labor and materials services at the Mayor's Office of Emergency Management on time and materials basis.
1 shared topics · Same agency, volume and box · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171379
Work order authorizing labor provision for additional tasks at the Mayor's Office of Emergency Management on time and materials basis.
1 shared topics · Same agency, volume and box · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171367
Work order for additional electrical work at 7 WTC 23rd floor Commissioner's suite on cost-plus basis.
1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171584
RBS work order form authorizing additional labor and material costs at the 7 World Trade Center site on a cost-plus basis.
1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171469
Authorization for additional work to relocate speaker strobes at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171451
Authorization to proceed with additional time and material work specified for the 7 World Trade Center project.
1 shared topics · Same agency, volume and box · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000171375
Work authorization for non-union electrician labor and materials at 7 World Trade Center.
Similar indexed content
Similar indexed content
Work order authorization from R.B. Samuels for additional construction work at 7 World Trade Center with cost basis including materials and labor.
Similar indexed content
NYC-WTC_000171381
Work authorization for additional labor and materials services at the Mayor's Office of Emergency Management on time and materials basis.
Similar indexed content
NYC-WTC_000171379
Work order authorizing labor provision for additional tasks at the Mayor's Office of Emergency Management on time and materials basis.
Similar indexed content