NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Program Summary
Document / 8 pages

Analyst report on current locations for Mayor's Office of Emergency,

Machine-extracted title · confidence 90%

Report detailing current office locations and project status for the Mayor's Office of Emergency Management relocation.

NYC-WTC_000170942–000170949

Folder label: “Program Summary

Page image
Scanned page image, NYC-WTC_000170945
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

BACK-UP SYSTEMS * All of those requirements need to be further Investigated, clarified end designed by the Agency and with the assistance of specialised consultants. AH information as depicted below was provided by the RBA Group and requires confirmation. UPS (Uninterrupted Power Supply) Fuel Storage The fuel supply is to last for a two week period and provide all necessary fuel for the functioning of the facility. The requirements include two tanks of 25,000 gallons each. Each tank will take approximately 430 square feet each and there will need to be riser capacity in the buildings core to get the fuel to the required locations. Water Storage The water supply is to be for both the fire suppression and for the potable water requirements. The estimated requirements as they currently are understood include 15,000 gallons of water for fire suppression and 30,000 gallons of potable water. The fire suppression system should permit 0.1 gpm/1,500 SF for 90minutes or as required by applicable lawsZcodes. Mechanical Room with condensers and generators The Mechanical Room requirements are to be housed on a separate floor from the main office/technology functions. The room is required to house approximately twelve condensers which require approximately 360 SF of louver space each and provide 10 tons of air. The room wilt also house the two required back up generators for the space each requiring 300Sf of louver space. Elevator back up generator A freight elevator is to be on a separate generator from die base buildings back up elevator system. This duplication of services is to ensure continued service.

ROOF SPACE * An of these requirements need to be further investigated, clarified and designed by the agency and widr the assistance of specialized consultants. Satellite Dishes Requirements are to be developed and confirmed by the project engineers and consultants. Two satellite dishes are required; Weather Service Down Link and FEMA. Antennas Requirements are to be developed and confirmed by the project engineers and consultants. Approximately 925) antennas are to be required; Motorola is developing requirements along with agency.

E. Security Issues: Entire facility is to be secured area. Access to the EOC will be limited to a needs basis only. Access to the Mayors office suite and conference rooms and Press Room will be equally limited.

The security system is to be developed and provided by the Agency and their consultant It is to include but not limited to a controlled access systems, cameras inside and outside of the unit on site security guards.

Special documents require secure location in the Security suite in a specialized, lockable closet Agency to provide exact specifications.

F. Parking Requirements: The parking requirements will be accommodated by the City's Department of Transportation.

4

NYC-WTC_000170945

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000170945Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Space analysis by unit for OEM project 96-1346 · Box 7DCAS

NYC-WTC_000168320

A detailed space analysis sheet dated October 1997 listing personnel counts and square footage for various units at the Office of Emergency Management.

6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗
OEM space analysis summary sheet, Aug 1997 · Box 7DCAS

NYC-WTC_000170916

Space design and programming summary for Office of Emergency Management including personnel counts and square footage.

6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →