Memo regarding 7 WTC lease rent commencement date, December 1997

Machine-extracted title · confidence 95%

Legal memo questioning the fixed rent commencement date and potential loss of rent credits in the draft lease.

NYC-WTC_000170176

Folder label: “7 WTC Draft Lease #4 for Mayor's Office of Emergency Planning ®Fixed Rent Commencement Date of January 1, 1999

Page image
Scanned page image, NYC-WTC_000170176
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Fax:12:27330367 Dec 19 '97 15:42 P.02

PRIVILEGED AND CONFIDENTIAL MEMORANDUM

TO; JEFF KONDRAT DCAS Assistant Cuuimissioner

FROM: JASON CUTLERy*^^ Assistant Corporation Counsel (Tel. 788-0733)

RE: 7 WTC Draft Lease fur Mayor’s Office of Emergency Planning Fixed Rent Commencement Date of January 1, 1999

DATE: December 18, 1997

Current draft lease #4 (page 5, top) baa a fixed rent commencement date of January 1,1999, no matter when substantial completion of the necessary alterations take place. Is this still acceptable to us?

How much of the originally negotiated rent credit are we willing to give up? It appears that we are going to lose a significant amount uf Uda credit. Based on the current situation when do we anticipate substantial completion of the office space and the tech space to take place? If we liave to live with a fixed tent commencement date, should we try to negotiate that it is contingent on Landlord having a fixed date for Substantial Completion and that any delay beyond that fixed date would extend our rent commencement date?

Also assuming the normal office space (approximately half the demised premises, 1 believe) is completed and occupied by OEM 2 months prior to the completion of the tech space, as contemplated by the attached time line diagram dated 7-21-97 (ID 45 and 50), afe we entitled to a deferred rent credit for the tech space for the period of time between the completion of the office space and the later completing of the tech space? How long do wc have to pay rent for the current space occupied by OEM? Should we have something in the lease requiring Landlord to first complete the office space? Is (his practical?

Time required for Plan preparation: The attached time Une diagram (ID 29-32) (ID 29-32) assumes about 2 months for preparation of the preliminary plans and another 2 and 1/2 months (ID 34-37) for final plans sign-ofi How much, if any, of the architect’s services been done so far? Have we lost the b^efit of these 4 and 1/2 months? If so, how does this affect the date which we commence to pay rent ie. the amount of our rent credit? Note: only one month or the construction bid process is contemplated in the time line drawing.

When can we determine the maximum amount of the cost for the alterations? We, of course, have tn .specify that amount in the lease and be comfortable that it is sufficient.

JC End.

NYC-WTC_000170176

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000170176Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →