NYC 9/11 Public Portal Document
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY, BOROUGH
PRESIDENT'S OFFICE, MANHATTAN.
BURDEN EASEMENT
(EASEMENT AREA NO. 3)
FOR LANDING OF PEDESTRIAN BRIDGE FROM IRVING TRUST BUILDING CROSSING
BARCLAY STREET ANO OVER SUCH BRIDGE LANDING FOR PUBLIC PEDESTRIAN
PASSAGE AT PLAZA LEVEL.
ARSA AT CORNER OP WASHINGTON AND BARCLAY STREETS
BEGINNING AT THE CORNER FORMED BY THE INTERSECTION OF THE EASTERLY LINS
OF WASHINGTON STREET WITH THE SOUTHERLY LINE OP BARCLAY STREET;
1. RUNNING THENCE NORTH 88 DEGREES 37 MINUTES 20 SECONDS WEST, ALONG
THE WESTERLY PROLONGATION OF THE SOUTHERLY LINE OP BARCLAY STREET,
10.61 FEET;
2. THENCE NORTH 43 DEGREES 37 MINUTES 20 SECONDS WEST, 20.98 FEET;
3. THENCE SOUTH 88 DECREES 37 MINUTES 20 SECONDS EAST, 46.64 FEET;
4. THENCE SOUTH 46 DEGREES 22 MINUTES 40 SECONDS WEST, 20.98 FEST, TO A
POINT IN THE SOUTHERLY LINE OF BARCLAY STREET;
5. THENCE NORTH 88 DEGREES 37 MINUTES 20 SECONDS WEST, ALONG THE
SOUTHERLY LINE OP BARCLAY STREET, 6.37 FEET TO TSE POINT OR PLACE OP
BEGINNING.
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY, BOROUGH
PRESIDENT'S OFFICE, MANHATTAN.
BOROEM EASEMENT
POR PUBLIC PEDESTRIAN PASSAGE AT STREET LEVEL.
EASEMENT AREA NO. 4
BEGINNING AT A POINT IN TBS NORTHERLY LINE OP VESEY STREET DISTANT 7.16
FEET WESTERLY FROM TBS CORNER FORMED BY THE INTERSECTION OP THE
WESTERLYLINE OP WEST BROADWAY WITH THE NORTHERLY LINE OP VESEY STREET;
1. RUNNING THENCE SOUTHERLY ALONG THE LINE OF VESEY STREET, FORMING AN
angle of 102 DECREES 06 MINUTES 41 SECONDS ON ITS EASTERLY SIDE WITB
THE SOUTHERLY LINE OF VESEY STREET, 1.79 FEET TO AH ANGLE POINT
THEREIN;
NYC-WTC_000169607
OCR can misread numbers and units. Confirm readings against the page image before using them.