NYC 9/11 Public Portal Document
■V'
.P- ■
BEARINGS ARE IN THE SYSTEM USED ON TSE BOROUGH SURVEY, BOROUGH
PRESIDENT’S OFFICE, MANHATTAN.
BURDEN EASEMENT
(EASEMENT AREA NO. 3)
FOR LANDING OF PEDESTRIAN BRIDGE FROM IRVING TRUST BUILDING CROSSING
BARCLAY STREET AND OVER SUCH BRIDGE LANDING FOR PUBLIC PEDESTRIAN
PASSAGE AT PLAZA LEVEL.
AREA AT CORNER OF WASHINGTON ANO BARCLAY STREETS
BEGINNING AT THE CORNER FORMED BY THE INTERSECTION OP TBS EASTERLY LINS
OF WASHINGTON STREET WITH THE SOUTHERLY LINS OP BARCLAY STREET;
1. RUNNING THENCE NORTH 88 DECREES 37 MINUTES 20 SECONDS WEST. ALONG
THE WESTERLY PROLONGATION OF THE SOUTHERLY LINE OF BARCLAY STREET/
10.81 FEET;
2. THENCE NORTS 43 DECREES 37 MINUTES 20 SECONDS WEST/ 20.98 FEET;
3. TSENCE SCUTS 88 DECREES 37 MINUTES 20 SECONDS EAST, 48.84 FEET;
4. TSENCE SOUTH 46 DECREES 22 MINUTES 40 SECONDS WEST/ 20.98 FEET. TO A
POINT IN TSE SOUTHERLY LINE OF BARCLAY STREET;
S. TSENCE NORTB 88 DEGREES 37 MINUTES 20 SECONDS WEST. ALONG THE
SOUTHERLY LINE OF BARCLAY STREET. 8.37 FEET TO TSE POINT OR PLACE OP
BEGINNING.
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY. BOROUGH
PRESIDENT’S OFFICE. MANHATTAN.
BORDEN EASEMENT
POR PUBLIC PEDESTRIAN PASSAGE AT STREET LEVEL.
BASEMENT AREA NO. 4
BEGINNING AT A POINT IN THE NORTHERLY LINE OP VESEY STREET DISTANT 7.18
FEET WESTERLY FROM THE CORNER FORMED BY THE INrERSBCTIOM OP THE
WESTERLYLINE OP WEST BROADWAY WITH THE NORTHERLY LINE OP VESEY STREET;
I. RUNNING THENCE SOUTHERLY ALONG THE LINE OP VESEY STREET. FORMING AN
ANGLE OF 102 DEGREES 06 MINUTES 41 SECONDS ON ITS EASTERLY SIDE WITH
THE SOUTHERLY LINE OP VESEY STREET. 1.79 PEET TO AN AMBLE POINT
THEREIN;
NYC-WTC_000169462
OCR can misread numbers and units. Confirm readings against the page image before using them.