NYC 9/11 Public Portal Document
ri— ■ -
BEARINGS ARE IN THE SYSTEM USED ON TSE BOROUGH SURVEY, BOROUGH
PRESIDENT'S OFFICE, MANHATTAN.
BURDEN CASEMENT
(EASEMENT AREA NO. 3)
FOR LANDING OF PEDESTRIAN BRIDGE FROM IRVING TRUST BUILDING CROSSING
BARCLAY STREET AND OVER SUCH BRIDGE LANDING FOR PUBLIC PEDESTRIAN
PASSAGE AT PLAZA LEVEL.
AREA AT CORNER OP WASHINGTON AMD BARCLAY STREETS
BEGINNING AT THE CORNER FORMED BY TSE INTERSECTION OF THE EASTERLY LINS
OF WASHINGTON STREET WITH THE SOUTHERLY LINE OP BARCLAY STREET;
I. RUNNING THENCE NORTH 88 DECREES 37 MINUTES 20 SECONDS WEST, ALONG
THE WESTERLY PROLONGATION OF TSE SOUTHERLY LINE OP BARCLAY STREET,
10.61 FEET;
2. THENCE NORTS 43 DEGREES 37 MINUTES 20 SECONDS WEST, 20.98 FEET;
3. TSENCE SCUTS 88 DEGREES 37 MINUTES 20 SECONDS EAST, 46.6* FEET;
4. TSENCE SOOTH 46 DEGREES 22 MINUTES 40 SECONDS WEST, 20.98 FEST, TO A
POINT IN THE SOUTHERLY LINE OF BARCLAY STREET;
S. THENCE NORTH 88 DEGREES 37 MINUTES 20 SECONDS WEST, ALONG THE
SOUTHERLY LINE OF BARCLAY STREET, 6.37 FEET TO TBS POINT OR PLACE OP
BEGINNING.
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY, BOROUGH
PRESIDENT'S OFFICE, MANHATTAN.
BOROEM EASEMENT
POR PUBLIC PEDESTRIAN PASSAGE AT STREET LEVEL.
EASEMENT AREA NO. 4
BEGINNING AT A POINT IN TBS NORTHERLY LINE OP VESEY STREET DISTANT 7.16
FEET WESTERLY FROM THE CORNER FORMED BY THE INTERSECTION OP TBS
WESTERLYLIME OP NEST BROADWAY WITH THE NORTHERLY LIMB OP VESEY STREET;
1. RONNING THENCE SOUTHERLY ALONG THE LINE OP VESEY STREET, FORMING AN
ANGLE OF 102 DECREES 06 MINUTES 41 SECONDS ON ITS EASTERLY SIDE WITS
THE SOUTHERLY LINE OP VESEY STREET, 1.79 FEET TO AH AMBLB POINT
THEREIN;
NYC-WTC_000169522
OCR can misread numbers and units. Confirm readings against the page image before using them.