NYC 9/11 Public Portal Document
MAR 17 ’99 14:22 FR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.03/03
AMBASSADOR CONSTRUCTION CO., INC.
March 17, 1999
Mr. Walter Weems
Silverstein Properties. Inc.
7 World Trade Center
New York, NY 10048
RE; Mayor’s Office of Emergency Management
7 World Trade Center -1, 7 & 23rd Floors
Change Order #076
Amb. Job # S57t5175
Dear Mr, Weems;
We are pleased to submit herewith our change order #076 to perform the following work at
the above referenced premises for the sum of SEVEN HUNDRED ONE DOLLARS
($701.00).
SCOPE OF WORK
- Relocate existing cold water make-up line which interfered with
the kKation of the Motorola riser work as requested by Silverstein
Building Engineers. This work was perform^ on a time and material
basis. Plumbing $605.00
General Conditions 48.00
Overhead & Fee 39,00
Insurance .9.00
Total $701.00
Please notify us if we are to proceed with this work.
Very truly yours.
AMBASSADOR CONSTRUCTIpN CO., INC.
Marlin Schneider
Vice President
MS.am
cc; Juan Mejia - SHC
Glenn Pymento - DCAS
Accepted:________ Dated:
317 MADISON AVENUE • NEW YORK, NY 10017 • 212 9221020 • FAX 212 949 9762
** TOTAL PFGE.03 **
NYC-WTC_000168460
OCR can misread numbers and units. Confirm readings against the page image before using them.