Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗KBI Systems boardroom and conference room project portfolio
Machine-extracted title · confidence 70%Portfolio document detailing selected boardroom and conference room projects completed by KBI Systems over three years.
NYC-WTC_000168106–000168137
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
pgrity says ARCHITECTURAL SPECIFICATIONS All veneers are book-matched from sequence numbered stock with exposed edges banded under pressure. Mitered or tongue and groove joinery is pressure-clamped and glued. All mounting cleats are screwed in place. Bases are joined with spline or miter corners, glued and hand clamped. All finishes are VanSan's exclusive five-coat process, hand sanded and hand rubbed.
Special notes: Standard lecterns: Series 100 & 200 Table top lectern; Model LE-22 These lecterns feature a walnut or oak wood-grain finish (or other specified material), bonded to first quality fiber board with all exposed edges banded under pressure. Mitered or tongue and grove joinery is pressure clamped and glued and all mounting cleats are screwed in place. The Series 200 and LE-22 are specifically carpet covered. Carpet is Vee-Lok® (Oxford style) from General Felt Industries (GFI®), see inset on page 3. Lectern bases are joined with mitered corners, glued and hand clamped.
EQUIPMENT OPTIONS Self-contained AC Sound System The VanSan Sound System consists of the following: 75-watt MOSFET amplifier; one tri-radiant speaker system; one dynamic, unidirectional microphone; one built-in AC power cord. The control panel includes ON/OFF Indicator LED; two microphone volume controls; line volume control; bass/treble control; XLR Connector for a second microphone; two line input jacks for audio source and one output jack for satellite speaker. Specify sound system by adding the letter “G” to the model number (i.e. LE-88G).
Exclusive “Lectrajust” Height Control The VanSan “Lectrajust” height control allows lectern to be A WORD ON WOOD. raised or lowered to any point between 46/2" high to 54/2" high Shown above is a (small) sampling of the 35 varieties of (8 Inches) at the rate of 1" per second. Motor and lift assembly wood veneer that we have used for VanSan lectern finishes. are noise-isolated for smooth, silent operation. A rocker switch Since wood is a natural product, it is to be expected that no controls the motor and features a built-in protection against matter how characteristic a wood is, there will be slight over-run. The motor is enclosed in a locked panel and has a variations in color value and grain pattern from piece to detachable, 3-wire grounded plug and Hubbell socket. piece. Also, translating a piece of wood from the actual Select “Lectrajust” by adding the letter “L” to model number object, to color photograph and then to the printed page (i.e. 1700L-32). creates still further variations. We cannot guarantee a perfect match from printed image to finished product... we Note: VanSan standard finishes are natural oak and walnut. All can guarantee you the finest quality of wood, prepared and other woods are optional. Call for quotation. finished by VanSan’s dedicated craftsmen.
NYC-WTC_000168136
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000172894
Proposal from Verrex Corporation dated May 18, 1998 to supply audio-visual systems for the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167919
Drawing detail specifying dimensions and specifications for a bullet-resistant package receiver.
1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174100
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173500
Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000168976
Page from a file containing fire reports and records associated with 7 World Trade Center.
1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114019
Letter and chain of custody document tracking HVAC and environmental inspection samples from 333 Rector Place.
Similar document embedding; no shared entity or topic indexed. · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146854
Page containing unreadable characters and fragments from a Department of Environmental Protection file.
Similar document embedding; no shared entity or topic indexed. · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar document embedding; no shared entity or topic indexed. · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127695
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar document embedding; no shared entity or topic indexed. · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Page from a file containing fire reports and records associated with 7 World Trade Center.
Similar indexed content
NYC-WTC_000114019
Letter and chain of custody document tracking HVAC and environmental inspection samples from 333 Rector Place.
Similar indexed content
Proposal from Verrex Corporation dated May 18, 1998 to supply audio-visual systems for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similar indexed content
NYC-WTC_000146854
Page containing unreadable characters and fragments from a Department of Environmental Protection file.
Similar indexed content