NYC 9/11 Public Portal Document
02/16/99 17:15 FAI 2122190256
swanke Hayden covvFrr
12)002
O2/18/90 13:00 Elix 2X2 738 3919 C03ENTINI ASSOCIATES ®002/QQ3
COfiENnWASSOCHATBSULr ■ TWO FENN. PLA2A, PIEWYORK, NY Mill" MMiMfOOa FAX11MIW7«6
JOB MEMORANDUM
TO: Mr. Michael W. Maybarun SUBJECT: Mayor's Office of
Emergency Management
FROM: Vai Lemeshev JOB NO: 1854
CC: Mr. Joe Aliotta, SHCA DATE: February 12,1999
Mr. Marlin Schneider, Ambassador Revised February 16,1999
Ambassador Construction Corp, requested our partioipatioD in the field meeting to review scope
and coordinate work associated wilh die facility monitoring system and to be pecfoimed by
Johnson Controls, Die.
Meeting was scheduled and took place on February 11,1999, but representative from Johnson
Controls, Inc. was not in attendance.
As per request ofMr. Gieo Fimeuto we have reviewed operation at air conditioning equipment
serving the Lan room.
The foUov/ing are our finrKnga and lecooisiendatioiis:
At the time of scnv^ all three (3) air conditioning units were in operation.
It should be noted, that maxinrum two (2) AC units shall be in opCTAtioftsuxaittwieously . one
unit is a stand-by and should be activated only'vdien one ofdie running units friils or when Wgli
room temperature is detected.
Monitoriag of the opciation of AC units and room conditions is die work to be pafonnod by
Johnson Controls Ino.
Mechanics from the Aback Entnpdses woe on die job site setting-up and adjusting die units.
They wete verbally instructed to shut-down one AC unit (AC-2) and to set one unit (AO3) at 72"
F and second one (AOI) at 75" F. Ai^ustablc vanes at die discharge grilles should, be adjusted
to direct sir horfcrontaliy and away from any obstruction such, as equipment racks, cable trays, etc.
to prevent short circuiting of die air and, as a result, short circling of the compressor and unit
shut-dovm without aiqr remote alarm.
It was mentioned by Mr. Glen Pimento that not all the communication eqaipmeut, scheduled for
installation^ is actually in the LAN room but OEM is considering to install additional equipment
(UPS).
There Is sufficient capicliy of the AC equipment in die LAN room to handle the existing and
flitura load.
NYC-WTC_000167652