NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 WTC OEM Emergency Generator - Fee Proposal
Document / 1 page

Job Memorandum on Generator Requirements, Oct 1997

Machine-extracted title · confidence 85%

Memorandum outlining requirements for outdoor generators and fuel systems to support the 24-hour operation of the OEM facility at 7 World Trade Center.

NYC-WTC_000167301

Folder label: “7 WTC OEM Emergency Generator - Fee Proposal

Page image
Scanned page image, NYC-WTC_000167301
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

10/10/87 mi 14:36 FAX m 738 3618 COSBNTZNt ASSOC. 0002

COBBMTim AIBOCIATIS LbF ■ TWO «W. PLAZA, NSW YORK, NY 10121 ■ JU-6IS-3W ■ FAX 211-415-3700

JOB MKMOJUNDW

TO: Mr. Joe Aliotta, SHCA SUBJECT; 7 World Trade Center Office of Emergency Management Emergency Generator > Fee Proposal PROM: Michael W. Maybaum JOB NO: 9995 CC:

DATE: October 9,1997 Revised October 10,1997

To support ths 24th floor office of emergency management, we believe the following will be Kquir^t

1. Outdoor sound attenuated weather proof efnergencx generator (800*1000 KW). 2. Fuel oil Stonge and pumping system. 3. Electrical distribution system and automatic tranafer switches to pick up new equipment loads and base building loads required to support the 24/7 operation. These items will include:

Elevator including cooling and controls Fire alarm system and controls including smoke purging Domestic water pumping system ood hot water heatbg equipment Cooling tower and cooling tower make-up and winterbation Condenser water pumps and controls (house tanks, etc.) Modifications to the building controls to enable 24/7 operation of die new generator Building security system

Our fee for the above work 830,000.00 Should you have any questions, please contact the writer. Note: 1. Our foe assumes “as-bullt” electrical and mcchanieal drawings and infonnatton exist. 2. Mechanical inftastructure modifications such as changes to base building systems and the addition of newtefrigeration/AC systems is not included in the above fee or included in MEP flyout fees previously provided. 3. Modifications to base building electrical systems such as new risers, switchboards, etc. is not included.

S0/50:39«d 0t-9£6993T5T :Qi Oil W0HS:W0ad fT:ST 2.6 0T-iOO NYC-WTC_000167301

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167301Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC revised quotation fax, June 1998 · Box 7DCAS

NYC-WTC_000172331

Fax from P.J. Air Conditioning Contractors submitting a revised price quote for HVAC work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →