NYC 9/11 Public Portal Document
Apr*-H-OO O8:4OP
P.O3
Item * Description I Part* Quantity Unit Price Total
7. Design "workstation" countertop to ensure the most effleient
use of space in EOC. Workstation design will optimize the efficiency
and comfort of cad oxer. I
8. Recommend additional support equipment and EOC fomtture
y. Establish "operational" design to ensure effletent operational information
flow. This will iadndc the dexipi sad layont of how the EOC shoald I
be staffed both iatemally sad where other agencies will reside while at EOC.
10. EIS will ensare the integratioa of esistlag EOC systems to meet I
operational needs. Includes the integration of cmeri management software,
coflunnnlcaaeBS, weather, telcvisian feed, etc. I
11. Ensure interoperability of existing information systems within EOC
1 EIS Consulting Services: Hourly Rate for EOC Design CCONTH 288 S12S $30,000
Consaltiag Services. All project activity will be charged at a
rate of $125.00 per hour.
EIS CoBiultant's Expenses, billed on an ACTUAL basis.
The following figares can be used tor planning porposes:
Roundtrip Airfore: $4504Ught tor 5 flights $2450
Lodging; $125/nigfat for 5 nights_________ $625
Per Diem; $45Zday for 5 days___________ $225
Subtotal $3,100
GAA®18%________________________ $558
2 Total ESTIMATED Travel Expenses; $3,658 EXPGA 1 $3,658 $3,658
3 Misceflaneons Expenses EXPGA 1 $3400 $3,000
These expenses iaclnde all services reisted to doenment
preparation, administrative services, courier services etc.
Notes: 1 I $02,658 I
Tax:
Shipping:
Total: I $42,658 1
ItERMS: FOB Point Destiaadon, UPS Ind Day Air
Purchase Order Net 10 days Payable ia U.S. dollars
Conffrming signature: Data:
Page 2
NYC-WTC_000167283
OCR can misread numbers and units. Confirm readings against the page image before using them.