Access node implementation schedule, 7 World Trade Center, 1998

Machine-extracted title · confidence 90%

Schedule detailing the implementation timeline for access nodes and fiber installation at 7 World Trade Center.

NYC-WTC_000166771

Folder label: “ACCESS NODE IMPLEMENTATION

Page image
Scanned page image, NYC-WTC_000166771
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

** 20THXOl **

ACCESS NODE IMPLEMENTATION

DAYl ROOM READY WEEKl FULL COPPER AND FIBER SPUCE AND TEST INSTALLATION OF NODE AND POWER PLANT

OC12 DESIGN WEEK 2 WIRING OF NODE AND POWER PLANT INVENTORY EQUIPMENT INTO DATABASES T1*S RIDING OC12 - DESIGN A BUILD

WEEKS 3-5 FCOT INSTALLATION IN CO. NODE - DSO WIRING & LOCAL TESTING

WEEK 6 TURN-UP & END TO END TEST NORTEL TESTING WEEK? RELEASE SERVICE ORDERS, CHECK FOR CORRECT FLOW-THROUGH

TRANSLATE LINES

WEEKS DISPATCH TECHNICIANS FOR CROSS­ CONNECTS

WEEK 9 HAND OFF DIAL-TONES TO DOIIT

OO+, _ TIIKHILH TRff MJ fisstx 86. ITlf NYC-WTC_000166771

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166771Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →