Document / 127 pages
Proposal for MEP engineering services dated May 6, 1992
Machine-extracted title · confidence 90%Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.
NYC-WTC_000166571–000166697Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Presentation document for architectural and MEP engineering services, undated · page 4 · Box 7DCASNYC-WTC_000166535
Document presentation regarding architectural and MEP engineering services for a specific project or client.
Similarity score 0.961 (not a probability)
Asbestos inspection supplement, 182 Broadway, Aug 2002 · page 2 · Box DEP Box 49NYC-WTC_000122972
Supplemental report on north facade cleanup at 182 Broadway noting a water leak incident from a fire hydrant.
Similarity score 0.950 (not a probability)
EPA Indoor Air Working Group meeting minutes, May 2002 · page 12 · Box DEP Box 05NYC-WTC_000140796
Minutes from the EPA Indoor Air Working Group meeting held on May 9, 2002, at 290 Broadway.
Similarity score 0.950 (not a probability)
Minutes of Meeting #1 for OEM Construction Project, July 14, · page 4 · Box 7DCASNYC-WTC_000173774
Record of attendance and discussion topics from the first meeting regarding the Mayor's Office of Emergency Management renovation.
Similarity score 0.950 (not a probability)
NYC-WTC_000094202 · page 2 · Box Asbestos - BOX 5Similarity score 0.949 (not a probability)
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 161 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.947 (not a probability)