Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166594
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

III. Similar and Current Projects TKLP

Name of Facility and Location Operations Center, Stanton, Delaware Your role (MEP, consultant, etc.) Full Architectural and MEP Engineering Services Client Contact J. P. Morgan Services Inc. (Name, Address, Phone) Robert J. Hitchens, Jr., Vice President 500 Stanton Christiana Road Newark, DE 19713-2107 302/992-1233

Architect Contact TKLP was the Architect of Record for this project. (Name, Address, Phone) Contractor or Construction Mr. Ted Dwyer Manager Contact: EDIS (Name, Address, Phone) 302/421-5700

Completion Date 1986

Gross Square Footage 330,000

Net Square Footage 240,000

Net Square Footage of 85,000 Data Center

Construction Budget $50,000,000

Actual Construction Cost $44,000,000 Owner Name and See client contact above. Phone Number Description The primary elements of this 300,000 SF facility are the data center, which provides data processing and communications network services; the operations center, which accom­ modates large clerical operations using desktop computers; the Commons, which contains shared facilities such as dining areas and administration; and the central plant, which houses utility and support services. The Commons links the three-story data and opera­ tions centers, which have raised access flooring throughout. The central plant is a separate structure connected to the main building by a utility tuimel. Two utility feeds, a UPS system, and emergency power generation provide backup for the critical electrical sys­ tems. Preaction sprinklers and dry halon 1301 provide fire protection.

Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P237] in-n

NYC-WTC_000166594

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166594Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →