Document / 7 pages
General notes for drainage work specifications, 10th Ave Tunnel
Machine-extracted title · confidence 95%Contract notes specifying requirements for maintaining existing connections and restoring manholes during tunnel construction.
NYC-WTC_000165853–000165859Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
DEP record fragment, Dec 14 2001 · page 1 · Box DEP Box 04NYC-WTC_000002141
Fragmented DEP document from December 2001 regarding World Trade Center site activities.
Similarity score 0.955 (not a probability)
Air sampling results memo, Trinity Place, Dec 2-3 2001 · page 1 · Box DEP Box 02NYC-WTC_000095167
Memo reporting air sampling results conducted between December 2 and 3, 2001 at the Exchange building.
Similarity score 0.953 (not a probability)
Asbestos cleanup response letter, 120 Broadway, Feb 2002 · page 12 · Box DEP Box 50NYC-WTC_000123776
Contractor letter to DEP responding to notice regarding asbestos inspection and cleaning at 120 Broadway prior to re-occupancy.
Similarity score 0.952 (not a probability)
Chain of custody for air samples from 125 Water Street, · page 150 · Box DEP Box 53NYC-WTC_000129725
Custody form documenting the transfer and analysis of air samples collected at 125 Water Street in September 2002.
Similarity score 0.952 (not a probability)
DEP service request label, 202 Broadway, March 2002 · page 1 · Box DEP Box 49NYC-WTC_000123232
Administrative label for a DEP service request log entry regarding 202 Broadway.
Similarity score 0.952 (not a probability)
Asbestos cleanup response letter, 120 Broadway, Feb 2002 · page 14 · Box DEP Box 50NYC-WTC_000123776
Contractor letter to DEP responding to notice regarding asbestos inspection and cleaning at 120 Broadway prior to re-occupancy.
Similarity score 0.952 (not a probability)