STANDARD INLET
WITH CURB PIECE
B
Stondord Cost Iron
5’- 4" Frome and Grating 4*- O" 8"
7
(With Curb Piece)
T" a
-2- CO
'J-
A A
I ‘o
_I
V
<D
I
o
Inlet Connection
on Concrete Cradle or
B NOTE:
Encosed os Required
Locction end Angle of Inlet
PLAN VIEW Connection Wc^ Be Varied to PLAN VIEW
■ Sulf Field Conditions.
(with costing) 3" Minimum Drop from (without costing)
Inlet to Besin,
Legol Grode or Existing Surfoce Q» Directed^
3 IS.io
I, *
< 7^
9"Erick
) ____
8“ 4'- O" 8“ 8“ 3'-6" 8"
'o ■
3 I
"lO I
■i-r
1 ----
?
T r’-?AT.-.
-
r* Keyed Coratruction Joints Reg d.
o
SECTION A-A SECTION B-B
o
K
P YdO.
C-’lis? , Oaiiqn a S*<r. CTtwow al S«*«r tjanT C.>r«.»x>n<7
V roT._2^»ou st Severs
NYC-WTC_000165564
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000165564Source: NYC Law Department, mirrored locally
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.