NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN
Document / 18 pages

Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN

Page image
Scanned page image, NYC-WTC_000165277
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

15. DESCRIPTION OF WORK.

The work consists of abandoning an existing 6" diameter high pressure water line and installing a 6" diameter liigh pressure water line at W. 39th Street near 11th Avenue.

16. TIME FOR COMPLETION AND DAMAGES FOR DELAY.

The Contractor shall commence the work on the date on which a fully executed counterpart of this Contract is receivec} by him and shall complete the performance of all work within thirty (30) calendar days (Saturdays, Sudays and holidays included).

Damages to the Authority for delay in completion shall be liqui­ dated in the amount of Fifty Dollars ($50.00) per calendar day (Satur­ days, Sundays and holidays included).

17. OPERATIONS OF OTHERS.

During the time that the Contractor is performing the Contract, other persons will be engaged in other operations on or about the con­ struction site. The Contractor shall so plan and conduct his opera­ tions as to work-in harmony with others engaged at the construction site and not to delay, endanger or interfere with the operations of others (whether or not specifically mentioned above), all to the best interests of the Authority and the public and as may be directed by the Engineer.

18. CONDITIONS AND PRECAUTIONS. 1. Throughout the construction period, the Contractor shall maintain one half of West 39th Street clear and unobstructed for the movement of vehicular and pedestrian traffic. The construction area shall be protected in accordance with Section 2A.

2. During the periods that traffic will be riding on the backfilled trench (befor the pavement is restored) the Contractor shall place steel plates over the trench areas to provide a smooth riding surface. The Contractor shall Lake caution not to damage the existing tunnel structure and its waterproofing. Any damage that is incurred shall be repair­ ed to match the existing condition in Contractor's own expense. 3. The Contractor shall Lake caution not to damage any existing utilities which he may encounter during excavation. Any utility that is damaged shall be repaired in ConLrctor's own expense.

NYC-WTC_000165277

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165277Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.

Filed in the same folder

NYC-WTC_000165112 · Box DEP Box 44

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

Similar indexed content

Compare copies and versions →