ATC Associates monitoring contractor review, Jan 2003

Machine-extracted title · confidence 95%

Report on ATC Associates' performance and tracking issues during the USEPA indoor residential cleaning program.

NYC-WTC_000162805–000162806

Folder label: “E-mails 2003 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000162806
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

these re'sidences (each file folder is a residence) into the cancellation policy. 10. 5-10% of residents opt for aggressive monitoring. 11. ATC stated they schedule as many residences as they are able to reach for scheduling. ATC has tickler files with the cleanup scheduling and for the interview scheduling for a week out for field staff and following weeks in a cabinet. The files are coded orange for cleaning, blue for test only, and white for interviews. Up to 14 technicians are scheduled per day depending on the amount of scheduled work. Up to 4 monitors conduct the interviews. One is dedicated to this project, the others are assigned as needed. 12. ATC had one full time person placing calls to residents and responding to residents calls. There is a dedicated extension for this function with voice mail. A message on this line refers people to a cell phone number in case of an emergency. This “emergency” cell phone is monitored by two different individuals during after hours. One individual is dedicated to managing the databases and entering the data. The database is a follow-up to the paperwork folders set up for each unit. The folders are set up after contact is made and go through to the billing phase. If contact is not made the information is entered on sheets that are then data entered. 13. The database (initial phases of implementation as mentioned previously) has columns for call 1, call 2, call 3, call 4 with sub-columns in each for contact, no answer, left message, tenant will call back. Separate columns are dedicated to the date letters are sent out. There was a question from ATC in terms of how these letters should be sent out (regular mail or certified mail/retum receipt). The return receipt is more expensive and is not an acceptable cost for them to incur when the number of letters increases. 14. When field work is complete, it is placed in a location for billing. There were four full boxes (the size of the paper supply boxes) of completed work that was not billed. ATC will be working on them. 15. If a file returns from the field with a problem (ie. the work was not completed), Fred Burhardt reviews the file to determine the next step.

2

NYC-WTC_000162806

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000162806Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →