NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails 2002 M. Gilsenan
Document / 18 pages

E-mails 2002 M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000162445–000162462
Page image
Scanned page image, NYC-WTC_000162457
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program CieanBig Contract Scope of Work DRAFT - 6/24/02

A, Introduction f v ■ /y / / All work performed under this contract must be in complimice with all applicable, relevant, tmd appropriate reguiations, including but not limitedtotliose ofthe United States Environmental Protection Agency (EPA), flie United States Department ofLabor Occupational Safety and Health Administration (OSH A), the New' York State Department of Labor (NYS DOL), and the New York City Deparuneni of Environmental Protection (DEP). ■ ;

The USEPA aid DEP will solicit participation ina direct assistance program for residents :uid residential building owners south of("anal Street w ho are concerned that their apartments may have debris/dust from the collapse of the World 'I rade Center (WTU). A DEP/USEPA telephone hotline has been established to receive requests Ihnn the public. The assistance will include cuious optis »ns. including the claming within apartments and common spaces riy licensed asbestos contractors with follow-up asbestos sampling, asbestos air sampling only, and providing high efficiency particulate air (HEPA) vacuums.

NYS DOLlicensed asbestos contractors shall perform dean up aeh\ iiics for residents who wish to have their homes cleaned. A third party Monitoring Contractor will schedule and monitorthe work,peffoHn a visual inspection, and perform asbestos air sampling when the clean up is completed.

The purpose oflhis contract is to acquire the services ofaNYS DOL licensed asbestos contractor with DEPandNYS DOL certified workers Ibr the performance ofclean-up activities at residential buildings impacted by the collapse of the World Trade (denier. The scope of work for the clean-up aetivities is attached.

B. Rolen am/ Hesiwsi.sihi/ities The EPA has overall responsibility for insuring that work conducted as part ofthe Indoor Air Residential Assistance Program is completed safely, efficiently and in compliance with the Scope of Work and all applicable rules anti regulations. As such, EPA shall have the following authorities relating to work conducted under this contraci: A

The authority to stop work for health and safety reasons or for non-compliance with the Scope of Work./ eilT ■ r /

2/ The authority to direct the contractor in the performance of the work.

3. The authority to review and approve or disapprow ofthe cpalifications ofthe coatractorpersonnel involved in the work.

4. The right to inspect and accept or reject any work;

NYC-WTC_000162457

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000162457Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →