From: Glisenah, Michael (ex)
Sent: Monday, July 15, 2002 10:43 AM
To: '[email protected]'
Cc: Avaltroni, Robert; Radhakrishnan, Krish
Subject: Walkthrough
Kathy,
Just a reminder that the walkthrough with our asbestos/HVAC consultants took place last Friday
for 125 Cedar Street. We should have recommendations to share with you sometime this week.
In the walkthrough, it was clear that some items like floors can be taken up and cleaned, but
putting them back in the same condition will be problematic. The same is true with ceiling tiles
and some items particular to certain apartments. We will probably have to sit down with the
building owner to see if he might be in a position to replace with new materials.
DOH will check out the mold issue this week, just awaiting time and date from tenants'
representatives. (Krish has already formulated a plan to address the mold based on his
observation.) We will need to incorporate your requirements, sampling methods, etc., for metals,
mercury and dioxin this week. Once this all happens, we will be in a position to share with
tenants, etc.