Work shall not be performed at any building found to be structurally unsound.

An ACP7 form signed by the contractor and air-monitoring firm shall be submitted direcdy to the DEP representative on site. The DEP shall provide notification to the NYS DOL. The filing fees are exempt. The size of the project, specified area, shall be indicated on the ACP7 form, and shall be used to calculate payment. Building owners shall provide written authorization to the DEP for the work activities.

DEP will coordinate activities with building owners and other city agencies.

The sites and specific areas to be cleaned shall be determined and specified by the DEP.

The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, his employees, and Federal, State or local officials.

The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected waste. The contractor is responsible for supplying all necessary equipment.

The DEP will attempt to make arrangements with building owners/occupants for power and water. The contractor shall have electrical generators available on site in the event electrical power is not available.

The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of die specified methodologies only if the request is received in writing. Any substitutions must receive prior approval by die DEP.

For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit fi'om each work area. A remote decontamination system shall be acceptable with DEP on-site approval.

Contractor Qualifications

The contractor shall have on staff and assigned to this contract a sufficient number of properly trained and certified workers. See above.

Bids

A mandatory pre-bid meeting is scheduled for April 3,2002 at 10:30 A.M. at the NYC DEP 59-17 Junction Boulevard, 8* Floor Conference Room, Corona, New York.

Any questions regarding the scope of work may be directed to R. Radhakrishnan, P.E., Director Asbestos Control Program at (718) 595-3718.

Page 2 Modified to include Addendum 1 & 2 04/13/02 Prepared by PT

NYC-WTC_000160904

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000160904Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →