NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/114 LIBERTY 2 OF 2
Document / 65 pages

114 LIBERTY 2 OF 2

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000155647–000155711
Page image
Scanned page image, NYC-WTC_000155702
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

December 17, 2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS

12 MATERIALS AND EQUIPMENT

PART 1 - GENERAL

1.01 SUBMITTAL;

A. Submit manufacturer's technical product data, including product description and technical data for each product used on the project.

1.02 QUALITY ASSURANCE REFERENCES: A. When the Contractor is given the option of selecting between two or more products for use on the project, the product selected shall be compatible with products previously selected, even if previously selected products were also options.

1.03 DELIVERY, STORAGE AND HANDLING;

A. Deliver, store and handle products in accordance with the manufacturer's recommendations, using means and methods that will prevent damage, deterioration and loss, including thet.

1. Maintain packaged materials with seals unbroken and labels intact until time of use.

2. Store all materials on pallets, away from any damp and/orwet surface. Cover materials in order to prevent damage and/or contamination.

3. Promptly remove damaged materials and unsuitable items from the job site, and promptly replace with material meeting the specified requirements.

B. The Owner may reject as non-complying such material and products that do not bear identification satisfactory to the Owner as to the manufacturer, grade, quality, and other pertinent information.

PART 2 - PRODUCTS

2.01 PRODUCT SELECTION:

A. Scaffolding: All scaffolding shall be designed and constructed in accordance with OSHA (29 CFR 1926/1910), Municipal Building Code, and any other applicable federal, state, and local government regulations. Whenever there is a conflict or overlap of the above references, the most stringent provisions are applicable. All scaffolding and components shall be capable of supporting without failure of a minimum of 4 times the maximum intended load, plus an allowance for impact. All scaffolding and staging must be certified by a licensed professional engineer.

1. Equip rungs of all metal ladders, etc., with an abrasive, non-slip surface.

2. Provide non-skid surface on all scaffold surfaces subject to foot traffic. Scaffold ends and joints shall be sealed with tape to prevent penetration of contaminated dust. 50 © AMBIENT GROUP, INC. -2002

MATERIALS AND EQUIPMENT

NYC-WTC_000155702

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155702Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →