Background
A site visit at 114 Liberty Street revealed minor amounts of dust accumulation present on horizontal
surfaces throughout toe interior of toe building. The building is currently unoccupied. The interior
cleaning is to be accomplished by a licensed asbestos abatement contractor.
Purpose
A New York State Department of Labor (NYSDOL) licensed asbestos contractor with NYCDEP and
NYSDOL certified workers shall perform toe clean-up of building interiors (12 stories -5,000 to 6,000
square feet per floor). Each apartment occupies an entire floor with toe exception of toe top floor that is a
duplex and toe apartment on toe third floor that shares the floor with two commercial spaces. The entire
interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this
work. The building has central HVAC systems on each floor.
Scope of Work
(1) All work performed shall be in compliance with all applicable, relevant, and appropriate regulations,
including but not limited to those of toe United States Environmental Protection Agency (USEPA),
toe United States Department of Labor, the New York State Department of Labor (NYSDOL), toe
New York State Department of Environmental Conservation, toe New York City Department of
Sanitation, toe New York City Department of Health (NYCDOH), and toe New York City
Department of Environmental Protection. (NYCDEP).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15,
Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Control Program prior to the start of work. USEPA and NYSDOL notification shall be submitted.
(3) A third party air monitoring firm shall perform air sampling and provide project oversight.
(4) The asbestos contractor shall provide sufficient equipment and experienced personnel to complete
work area preparation and cleaning activities of toe building interiors within three (3) weeks.
Water/electrical supply shall be provided by residents/owner. At least one asbestos supervisor shall
be present per work area during toe duration of toe clean-up activities. Work shall be performed 24
hours per day, seven (7) days per week.
(5)—Personal protective equipment including disposable clothing, gloves, and respirators shall be worn
during this clean-up activity.
(6) Warning signs shall be posted at the approach to each work area.
(7) A separate worker and waste decontamination enclosure system in compliance with Title 15,
Chapter 1 of the RCNY shall be installed at toe entrance to each work area. More than one work