NYC-WTC_000097066
Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.
10 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗List of contract documents for WTC interior and exterior cleaning work including indemnification boilerplate, bonding requirements, insurance specifications, and general…
NYC-WTC_000154102–000154130Folder label: “WORLD TRADE CENTER - RESIDENTIAL APARTMENTS”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SUPPLY and SERVICE CONTRACT Page 5 of 7 GENERAL CONDITIONS INSURANCE
II. F. Marine Protection & Ind jly: SP-23 or Equivalent, including Property Damage and Bodily Injury to third parties arising from marine operations under this contract; injuries to crew members, if not provided through other insurance; property damage coverage shall include damage to wharves, piers, and other structures and loss or damage to other vessels not caused by collision.
II. G. U.S. Harbor Workers and Longshoremans Compensation Act: As applicable for employer's liability for injury to marine trades employees including operators of machinery on watercraft, if not otherwise provided for. If self-Insured, proper authorizations must be presented to the Contract Management Ofrce.
II. H. Ship Repairer's Liability: Covering all repair operations under this contract at, or in the vicinity of a designated approved port or yard under this contract. The policy shall attach from the point of acceptance of care, custody, and control of any City vessel for the purpose of repair.
ILL Business Auto Coverage: Contractor shall provide the Contract Management Ofrce with evidence of insurance covering all owned, non owned, and hired vehicles to be used in connection with this contract. If on a "scheduled autos" basis. Contractor shall present the schedule of insured autos, including the vehicles to be used for operations under this contract.
II. J. Builders Risk: Before any materials are purchased under this contract, the Contractor shall present the Department’s Contract Management OFRCE with the original policy evidencing that insurance as required in Schedule A has been issued. The policy shall be for this contract only and shall be issued for the term of this contract. Annually renewable policies will not be accepted. The original policy must be furnished to the Department’s Contract Management Ofrce as soon as it is available.
The policy shall insure the City and the Contractor as their respective rights and interests may appear under the contract and shall name the New York City Department of Environmental Protection as Loss Payee. The policy shall provide for storage and transport of all materials, equipment supplies of any kind whatsoever to be used on, or incidental to the project, and shall include off-site storage at limits as set forth in Schedule A. The value of property at risk off-site, in-transit, and at any site may not exceed the limits specified in the policy, and the policy shall be modified, if necessary, to provide higher limits.
DEP SUPPLY & SERVICE INSURANCE PROVISIONS: January 84,1998
NYC-WTC_000154119
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000097066
Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.
10 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112080
Contract exhibit detailing general conditions, bond requirements, and payment terms for the exterior cleanup work at 250 Vesey Place.
6 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094427
Contract document page specifying general conditions, bonds, payment terms, and damages provisions for construction or cleanup services.
6 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114353
Schedule detailing bond requirements and performance conditions for a supply and service agreement related to site cleanup work.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111939
Contract exhibit detailing general conditions and bond requirements for the supply and service of debris removal work.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130720
Exhibit B of a supply and service contract detailing general conditions and bond requirements for debris removal work.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099050
Administrative form outlining bond articles and financial terms associated with the environmental cleanup project at 94 Nassau Street.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107838
Document excerpt detailing work specifications for asbestos cleanup activities at 125 [name].
9 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099393
Contract for supply and services related to debris removal at 87 Nassau Street.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113453
Contract document defining terms for supply and service related to debris cleanup at 1 Water Street.
6 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094326
Exhibit B containing general conditions and schedule for supply and service contract including performance bond, payment, and labor and material provisions.
6 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108828
Regulatory specifications for asbestos abatement work including PPE requirements and decontamination systems at 125 [name].
10 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
Cited alongside this record in an Ask answer
NYC-WTC_000138296
Internal memo discussing potential litigation against the City related to 9/11 events, including estimated claims and liability concerns.
Cited alongside this record in an Ask answer
NYC-WTC_000147333
Facsimile from Mayor's Office to DEP regarding concerns about untrained workers cleaning dust potentially containing asbestos.
Cited alongside this record in an Ask answer
NYC-WTC_000151750
Letter responding to correspondence about the EPA World Trade Center Cleanup Program and its extension through December 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000153112
Internal departmental memo forwarding a request from NYC Law Department for a meeting on an undisclosed OIG-related matter affecting WTC recovery efforts.
Cited alongside this record in an Ask answer