Building Facade Clean-up
Work shall be performed by a NYSDOL licensed asbestos contractor with NYCDEP and
NYSDOL asbestos certified workers.
The contractor performing the cleaning should be experienced in cleaning building facades.
The area below the facade cleaning shall be covered with a layer of polyethylene sheeting and all
debris and water must be collected for disposal as ACM waste (i.e. All waste must be double
bagged in ACM waste labeled bags.)
B’uiding occupants shall be notified prior to the facade cleaning. Access to the street below the
tapade cleaning shall be restricted and marked with caution tape. Cleaning shall not be
performed during wind speeds greater than 20 mph.
All HVAC systems and air conditioners shall be turned off. All windows shall be closed during
the cleaning of the building. Some air conditioners and windows may require sealing with duct
tape to prevent water penetration.
In cases where equipment is rigged from the roof: All clean-up activities on the roof must
be completed prior to rigging equipment from the roof.
All horizontal surfaces and all windows on the facade shall be cleaned of large bulk material by
wetting and brushing, by wet wiping and/ or by HEPA vacuuming from top to bottom. The
removed material shall be immediately placed into containers (e.g. bags). Windows shall be wet
wiped. Free running water shall not be evident during this procedure. Power for HEPA
vacuums shall be supplied through ground fault interrupters.
After completing the above, the entire facade shall be carefully washed. A low pressure washing
technique, moving from top to bottom, shall be employed to minimize water bounce-back
At the completion of work, a visual inspection of the abated surfaces and sidewalk shall be
performed to verify die absence of visible debris.
Air monitoring shall be performed by an independent NYSDOL licensed third party air
monitoring firm with certified workers.
In order to minimize disruption to the public and to the building occupants, it is recnmmRnHpiH
this work be pcrlormed during off-hours.