Memo on USEPA indoor residential cleaning contractor performance, Jan 2003

Machine-extracted title · confidence 95%

Observation memo evaluating a contractor's implementation of USEPA indoor residential cleaning and testing program requirements in the Quad area.

NYC-WTC_000151308–000151309

Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file

Page image
Scanned page image, NYC-WTC_000151309
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r befope for fhe pre-cleaning visit. The air tech is then also scheduled for the next day. • Cole had 8 project monitors and 6 air technicians working the project. • 6-8 test only are scheduled per week. They are scheduled based on location of the cleanings. Air technicians may be responsible for sampling at more than one residence at a time depending on the proximity of the work. • 34 residents withdrew from the program • 2 residents were present for the cleaning, but have not been available for post testing. 2 residents changed from “test only” to “clean and test”. A larger number changed from “clean and test” to “test only” (not counted).

5. Invoices are sent to USEPA within one week of performing the post testing. Cole indicated there was a hold up at USEPA until the data entry is completed before the invoices are forwarded to DEP. Cole was instructed to get the data entry done.

5. HVAC inspections will begin tomorrow by Duct Dusters according to John Anuforo. Inquired as to whether you were informed. Stated he would call you.

5. An issue was raised that residents and building managers were not allowing the air sampling technicians to stay within the building and considered it loitering. The technicians must be allowed to stay and monitor their pumps. This is an issue USEPA should visit and set a policy with regards to the acceptability of the samples. Perhaps a clause in the agreement, that if post testing is not permitted to proceed according to the required and agreed upon parameters, then the resident is responsible for payment of the cleaning.

5. Mr. Anuforo stated that at current pace he expected the work in the quadrant to be completed by June or July.

2

NYC-WTC_000151309

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000151309Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000151127 · Box DEP Box 11

A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.

Filed in the same folder

NYC-WTC_000151141 · Box DEP Box 11

Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.

Filed in the same folder

Compare copies and versions →