An ACP7 foim signed by the buildir g owner, contractor, and air monitoring firm must be submitted
directly to the DEP. The filing fee is exen pted.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution
tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, his
employe .s, and Federal, State or local officials.
The contractor shall provide all necessary equipme it, to remove, bag, transport, and dispose collected
waste. The contractor is responsible for supplyir^g all necessary equipment
The DEP will attempt to make arrangements with building owners/occupants for power and water. The
contractor shall have electrical generators available on site in the event electrical power is not available.
The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of
the specified methodologies only if the request is received in writing. Any substitutions must receive i
I
prior sqjproval by the DEP.
Contractor Oualifications
The contractor shall have on staff and assigned to this contract a sufficient number of properly trained and
certified workers. See above.
Bids
A mandatory pre bid meeting is scheduled for March---- , 2002 at 10:30 A.M. at the NYC DEP 59-17
Junction Boulevard, 8**' Floor Conference Room, Corona, New York.
Any questions regarding the scope of work may be directed to R. Radhakrishnan, P.E., Director Asbestos
Control Program at (718) 555-3718.