An ACP7 form signed by the building owner, contractor, and air monitoring firm must be submitted
directly to the DEP. The filing fee is exen pted.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution
tape and warning signs shall be used to identify work areas. Access shall be limited to the contractor, h is
employees, and Federal, State or local officials.
The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected
waste. The contractor is responsible for supplying all necessary equipment.
The DEP will attempt to make arrangements with building owners/occupants for power and water. The
contractor shall have electrical generators available on site in the event electrical power is not available.
The specific clean-up procedures for building roofs are attached. The DEP shall consider substitution of
the specified methodologies only if the request is received in writing. Any substitutions must receive
prior approval by the DEP.
Contractor Qualifications
The contractor shall have on staff and assigned to this contract a sufficient number of properly trained and
certified workers. See above.
Bids
A mandatory pre bid meeting is scheduled ^or March---- , 2002 at 10:30 A.M. at the NYC DEP 59-17
Junction Boulevard, 8“* Floor Conference Room, Corona, New York.
Any questions regarding the scope of work may be directed to R. Radhakrishnan, P.E., Director Asbestos
Control Program at (718) 595-3718.
Mareh )4, fjc:
NYC-WTC_000150970
OCR can misread numbers and units. Confirm readings against the page image before using them.