DEP listing of buildings with visible WTC debris surveys, 2002

Machine-extracted title · confidence 95%

Document listing buildings identified with visible debris during surveys, including addresses, BINs, and landmark status for the clean-up program.

NYC-WTC_000150922

Folder label: “DEP EXTERIOR CLEAN UP - Also See Building Lists #2

Page image
Scanned page image, NYC-WTC_000150922
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Avaltroni, Robert From: LaGrotta, Robert Sent: Wednesday, April 17, 2002 7:57 AM To: Gilsenan, Michael Cc: Avaltroni, Robert; Heckler, Philip; Rabich, Sophia; Patel, Pravin; Collins, Betsy Subject: RE: American Express Building

This is a separately sewered area. They will have to catch the runoff wastewater and direct it into the sanitary sewer otherwise it will go into the storm sewer and the river. They should be in contact with Sophia Rabich of my staff concerning sewer discharge approvals. She can be reached at Ext. 4707.

—Original Message— From; Gilsenan, Michael Sent: Tuesday, April 16,2002 5:05 PM To: Collins, Betsy 001 Cc: Avaltroni, Robert; LaGrotta, Robert Subject: FW: American Express Building

Betsy/ Bob Fyi

—Original Message---- From: Radhakrishnan, Krish Sent: Tuesday, April 16, 2002 2:59 PM To: Gilsenan, Michael Subject; FW: American Express Building

FYI

—Original Message— Fram: Lutchmedial, Carlstien Sent. Tuesday, April 16, 2002 7:32 AM To; Radhakrishnan, Krish Subject: American Express Building On April 15, 2002 I met with Chris Sexton of Total Safety Consulting (212) 640-9136 and Michael Handler of Turner Construction 212.786.1480. The purpose of the meeting was to discuss the planned washdown of 1, 2, 3, 4 World Financial Centers. At this time, all the decontamination of the exterior had been completed. Samples had been collected for ACM and were negative.

Their concern was that when the washdown starts they do not violate any of DEP regulations. Water would be trucked in from outside so as to observe water restrictions. This they felt was the right thing to do, even if DEP allowed them to used the pipe borne supply. The washdown is a plain washing to give the entire clean up some finality. It was agreed that some soil sampling would be done where the run off is expected. So as to ensure that no form of contamination get into the sewer system. A review of the ACM sampling done revealed that only 4 samples were collected from each building (total of 16). Most had trace ACM. I requested that more sampling be done as 4 samples are not sufficient to represent the enormity of the buildings. However, they said that samples may be hard to find. In the end it was agreed that more samples would be taken. If the additional samples are negative, then the cleanup can go on as planned. A look at some of the small window ledges revealed that they were free of debris.

NYC-WTC_000150922

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150922Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →