7 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Building listing and air sampling results, Manhattan, Nov-Dec 2001
Machine-extracted title · confidence 100%List of Manhattan buildings with details on air sampling results and clean-up activities.
NYC-WTC_000150824–000150834Folder label: “DEP EXTERIOR CLEAN UP - Also See Building Lists #2”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DCAS buildings (City-Owned Buildings)
DCAS information was provided by Deputy Commissioner Joe Wagner. • The work as described in the developed checklist for re-occupancy has been completed. • Asbestos bulk and air sampling was performed. The results were satisfactory in both cases. (The material was found to be negative and air tests permitted re-occupancy). • All the ductwork has been cleaned. Window A/C unit has not been completed. The window units are expected to be completed by October 1®‘ as access to different locked offices becomes available. Notices have been posted at the buildings instructing staff not to turn on the window A/Cs. • All the buildings were checked for structural stability twice and they have been certified. Some repairs, some of which were identified prior to the WTC incident, are still needed and have been scheduled. • The impact and amount of work varied in different buildings. Sampling information available from DCAS
Consolidated Edison of New York • Con Edison Emergency Notification received 9/11/01 for the removal of 120 linear feet coal tar wrap under Brooklyn Bridge between Water and Front Street. • Emergency notification for the removal of 100 linear feet of steam insulation on Barclay Street between Washington and Greenwich Street. • ACP7 received on 12/12/2001 for the removal of 1,520 linear feet of steam insulation at a street excavation on Murray Street between Greenwich and Broadway (the “restoration effort”) • ACP7 received on 1/11/2002 for 50 linear feet at a street excavation on Washington Street between Vesey and Barclay Street. • ACP7 received on 1/11/2002 for the removal of 100 linear feet from a feeder pipe at South Street between Peck Slip and Dover for restoration. • Con Edison Emergency Notification received 9/11/01 for the removal of 120 linear feet coal tar wrap at South Street and Peck Slip. • Con Edison Notification received 12/4/01 regarding two 40 foot feeder cables at Vesey and West Street. • Con Edison Emergency Notification received 11/3/01 at West Broadway and Vesey Street.
11
NYC-WTC_000150834
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
66 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094856
Asbestos assessment report for 3 World Financial Center prepared by EMG, Inc. dated April 18, 2002.
7 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
21 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108678
Document page summarizing positive and negative counts for asbestos analysis via PLM, PCM, and TEM methods.
8 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000176247
Comprehensive environmental assessment report prepared by TRC Engineers for the New York City Law Department.
6 shared non-person entities · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097285
Summary of 94,014 asbestos samples collected and analyzed at 225 Liberty Street between September 2001 and January 2002.
7 shared non-person entities · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112085
Header page identifying records related to environmental work at 20 Vesey Street.
7 shared non-person entities · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125801
Cover sheet for a fax transmission from DEP regarding the 105 Duane Street site file.
9 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105771
Airtek Environmental Corp. submits a notice of air quality testing results and chain of custody forms for 176 Broadway in October 2001.
5 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164328
Draft cover letter prepared to accompany a document from the Department of Environmental Protection.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122745
Agreement between the City of New York and a landowner for cleanup of foreign material at 177 Broadway.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121849
Correspondence from NYC DEP informing building owners about completed exterior surveys for WTC debris contamination.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118748
Letter from NYC DEP requesting an assessment and cleanup of visible debris at 25 Beekman Street.
Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Liberty Plaza · 1 pages · confidence 1.00 · verify page 5
- 100 Church Street · 1 pages · confidence 0.85 · verify page 3
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
DEP asbestos project notification form and inspection report dated December 12, 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000148742
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Cited alongside this record in an Ask answer
NYC-WTC_000156442
Routing form from the Office of Emergency Management requesting urgent review and comments on a WTC site matter.
Cited alongside this record in an Ask answer
NYC-WTC_000156413
Summary report detailing bulk test results, air sample counts, and asbestos complaints received by building owners since September 11.
Cited alongside this record in an Ask answer
NYC-WTC_000104886
Fragmented text from a document describing asbestos abatement and cleanup procedures for the five-story building at 102-104 Greenwich Street.
Cited alongside this record in an Ask answer