NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 11/DEP EXTERIOR CLEAN UP - Also See Building Lists #2
Document / 11 pages

Building listing and air sampling results, Manhattan, Nov-Dec 2001

Machine-extracted title · confidence 100%

List of Manhattan buildings with details on air sampling results and clean-up activities.

NYC-WTC_000150824–000150834

Folder label: “DEP EXTERIOR CLEAN UP - Also See Building Lists #2

Page image
Scanned page image, NYC-WTC_000150834
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DCAS buildings (City-Owned Buildings)

DCAS information was provided by Deputy Commissioner Joe Wagner. • The work as described in the developed checklist for re-occupancy has been completed. • Asbestos bulk and air sampling was performed. The results were satisfactory in both cases. (The material was found to be negative and air tests permitted re-occupancy). • All the ductwork has been cleaned. Window A/C unit has not been completed. The window units are expected to be completed by October 1®‘ as access to different locked offices becomes available. Notices have been posted at the buildings instructing staff not to turn on the window A/Cs. • All the buildings were checked for structural stability twice and they have been certified. Some repairs, some of which were identified prior to the WTC incident, are still needed and have been scheduled. • The impact and amount of work varied in different buildings. Sampling information available from DCAS

Consolidated Edison of New York • Con Edison Emergency Notification received 9/11/01 for the removal of 120 linear feet coal tar wrap under Brooklyn Bridge between Water and Front Street. • Emergency notification for the removal of 100 linear feet of steam insulation on Barclay Street between Washington and Greenwich Street. • ACP7 received on 12/12/2001 for the removal of 1,520 linear feet of steam insulation at a street excavation on Murray Street between Greenwich and Broadway (the “restoration effort”) • ACP7 received on 1/11/2002 for 50 linear feet at a street excavation on Washington Street between Vesey and Barclay Street. • ACP7 received on 1/11/2002 for the removal of 100 linear feet from a feeder pipe at South Street between Peck Slip and Dover for restoration. • Con Edison Emergency Notification received 9/11/01 for the removal of 120 linear feet coal tar wrap at South Street and Peck Slip. • Con Edison Notification received 12/4/01 regarding two 40 foot feeder cables at Vesey and West Street. • Con Edison Emergency Notification received 11/3/01 at West Broadway and Vesey Street.

11

NYC-WTC_000150834

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150834Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →