NYC 9/11 Public Portal Document
Staten Island Landfill Debris Disposal Operation Health and Safety Program
methane. 9) Prior to cutting, verify that area is well ventilated
and test cutting area with LEL.
‘■I
Equipment to be used:
Hearing protection (level to be determined based on noise exposure monitoring), % face negative pressure respirators
with HEPA/OV filters, hard hats, eye protection/full face shield, protective footwear as required in EM 385-1-1.05.A.08.
high visibility orange reflective vests, warm clothing, heavy clothing suitable to offer protection against sparks, if
necessary.
Inspection requirements:
Daily inspection of all listed equipment should take place prior to donning. Equipment should be inspected for integrity
and completeness.
Training requirements:
Mechanical cutters will receive specialized training in the safe use of cutting equipment. Additionally, they will receive
site indoctrination. Respiratory protection will likely be provided by the individual fire departments, however supplemental
on-site respirator training, fit testing, and limited medical evaluations will be offered, if needed.
22
NYC-WTC_000150279
OCR can misread numbers and units. Confirm readings against the page image before using them.