NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 11/FORM LETTERS
Document / 5 pages

DEP notice to building owners, Sep 2001

Machine-extracted title · confidence 90%

Notice advising building owners on restarting air circulation systems and managing potential asbestos contamination in buildings south of 14th Street.

NYC-WTC_000150158–000150162

Folder label: “FORM LETTERS

Page image
Scanned page image, NYC-WTC_000150159
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Advisory for Building Facade Clean-up Page 1 of 1

•••••

Print PUBLIC NOTICE October 24. 2001 CONTACT: (718/337-4357)

Advisory for Building Facade Clean-up • The contractor performing the cleaning should be experien>. ;d in cleaning building facades.

• Building occupants shall be notified prior to the facade cleaning. Access to the street below the facade cleaning shall be restricted and marked with caution tape. Cleaning shall not be performed during wind speeds greater than 20 mph.

• All HVAC systems and air conditioners shall be turned off. All windows shall be closed during the cleaning of the building. Some air conditioners and windows may require sealing with duct tape to prevent water penetration.

• In cases where equipment is rigged from the roof: All clean-up activities on the roof must be completed prior to rigging equipment from the roof.

• All horizontal surfaces and all windows on the facade shall be cleaned of large bulk material by wetting and brushing, by wet wiping and/ or by HEPA vacuuming from top to bottom. The removed material shall be immediately placed into containers (e.g. bags). Windows shall be wet wiped. Free running water shall not be evident during this procedure. Power for HEPA vacuums shall be supplied through ground fault interrupters.

• After completing the above, the entire facade shall be carefully washed. A low pressure washing technique, moving from top to bottom, shall be employed to minimize water boimce-back.

• If the environmental assessment disclosed the debris is asbestos-containing material (ACM), this work shall be performed by a NYSDOL licensed asbestos contractor. The workers must possess NYCDEP and NYSDOL asbestos worker certification. The area below the facade cleaning shall be covered with a layer of polyethylene sheeting and all debris and water must be collected for disposal as ACM waste (i.e. All waste must be double bagged in ACM waste labeled bags.) < Back to rH/?//c Aoz/cct >

Prinl

NYC-WTC_000150159

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150159Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000150065 · Box DEP Box 11

Guidance issued by DEP to building owners outlining procedures for cleaning dust and debris potentially containing asbestos.

Filed in the same folder

NYC-WTC_000150067 · Box DEP Box 11

Instructions for building owners regarding the safe removal of debris inside structures following the World Trade Center attack.

Filed in the same folder

Compare copies and versions →