DEP Advisory for Facade Clean-up, Oct 24, 2001

Machine-extracted title · confidence 100%

Public notice from the Department of Environmental Protection providing guidelines for building facade cleaning operations.

NYC-WTC_000150092–000150093

Folder label: “FORM LETTERS

Page image
Scanned page image, NYC-WTC_000150092
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

feint Version - Advisory for Building Facade Clean-up http://nyc.gov/html/dep/html/press/print/facadepn.html

The City of New York '1 Department of Environmental Protection

PUBLIC NOTICE

October 24,2001 CONTACT: (718Z337-4357)

Advisory for Building Fagade Clean-up

• The contractor performing the cleaning should be experienced in cleaning building fagades.

• Building occupants shaU be notified prior to the fagade cleaning. Access to the street below the fagade cleaning shaU be restricted and marked with caution tape. Cleaning shaU not be performed during wind speeds greater than 20 mph.

• AU HVAC systems and air conditioners shaU be turned off. AU windows shaU be closed during the cleaning of the building. Some air conditioners and windows may require seaUng with duct tape to prevent water penetration.

• In cases where equipment is rigged from the roof: AU clean-up activities on the roof must be completed prior to rigging equipment from the roof.

• AU horizontal surfaces and aU windows on the fegade shaU be cleaned of large bulk material by wetting and brushing, by wet wiping and/ or by HEPA vacuuming fiom top to bottom. The removed material shaU be immediately placed into containers (e.g. bags). Windows shaU be wet wiped. Free running water shaU not be evident during this procedure. Power for HEPA vacuums shaU be suppUed through ground fault interrupters.

• After completing the above, the entire fagade shaU be carefuUy washed. A low pressure washing technique, moving fiom top to bottom, shaU be employed to minimize water bounce-back

• If the environmental assessment disclosed the debris is asbestos-containing material (ACM), this work shall be performed by a NYSDOL licensed asbestos contractor. The workers must possess NYCDEP and NYSDOL asbestos worker certification. The area below the fagade cleaning shall be covered with a layer of polyethylene sheeting and all debris and water must be collected for disposal as ACM waste (i.e. AU waste must be double bagged in ACM waste labeled bags.)

(www.nyc.gov/de^

lofl 11/21/01 12:17 PM

NYC-WTC_000150092

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150092Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000150065 · Box DEP Box 11

Guidance issued by DEP to building owners outlining procedures for cleaning dust and debris potentially containing asbestos.

Filed in the same folder

NYC-WTC_000150067 · Box DEP Box 11

Instructions for building owners regarding the safe removal of debris inside structures following the World Trade Center attack.

Filed in the same folder

Compare copies and versions →