DEP asbestos project notification form and inspection report dated December 12, 2002.
23 shared non-person entities · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
NYC-WTC_000149346–000149430Folder label: “AIR MONITORING - LAB”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
§763.84 40 CFR Ch. 1 (7-1-00 Edition) changes in occupancy, or recurrent (6) Any exterior portion of a mechan damage. ical system used to condition interior (3) The material is subject to major space, or continuing disturbance, due to fac SJgnJf}candy damaged Aiable misceda- tors including, but not limited to, ac neous ACM means damaged friable mis cessibility or, under certain cir cellaneous ACM where the damage is cumstances, vibration or air erosion. extensive and severe. Preventive measures means actions Significantly damaged friable surfacing taken to reduce disturbance of ACBM ACM means damaged friable surfacing or otherwise eliminate the reasonable ACM in a functional space where the likelihood of the material’s becoming damage is extensive and severe. damaged or significantly damaged. Removal means the taking out or the State means a State, the District of stripping of substantially all ACBM Columbia, the Commonwealth of Puer from a damaged area, a functional to Rico, Guam, American Samoa, the space, or a homogeneous area in a Northern Marianas, the Trust Terri school building. tory of the Pacific Islands, and the Vir Repair means returning damaged gin Islands. ACBM to an undamaged condition or to Surfacing ACM means surfacing mate an Intact state so as to prevent fiber rial that is ACM. release. Surfacing material means material in Response action means a method, in a school building that is sprayed-on. cluding removal, encapsulation, enclo troweled-on. or otherwise applied to sure, repair, operations and malnte- surfaces, such as acoustical plaster on nance, that protects human health and ceilings and fireproofing materials on the environment from friable ACBM. structural members, or other materials Routine maintenance area means an on surfaces for acoustical, fireproofing, area, such as a boiler room or mechan or other purposes. ical room, that is not normally fre Thermal system insulation means ma quented by students and in which terial in a school building applied to maintenance employees or contract pipes, fittings, boilers, breeching, workers regularly conduct mainte tanks, ducts, or other interior struc nance activities. tural components to prevent heat loss School means any elementary or sec ondary school as defined in section 198 or gain, or water condensation, or for of the Elementary and Secondary Edu other purposes. cation Act of 1965 (20 U.S.C. 2854). Thermal system insulation ACM means School building means: thermal system insulation that is (1) Any structure suitable for use as a ACM. classroom, including a school facility Vibration means the periodic motion such as a laboratory, library, school of friable ACBM which may result in eating facility, or facility used for the the release of asbestos fibers. preparation of food. (2) Any gymnasium or other facility §763.84 General local education agen which is specially designed for athletic cy responsibilities. or recreational activities for an aca Each local education agency shall: demic course in physical education. (a) Ensure that the activities of any (3) Any other facility used for the in persons who perform inspections, re struction or housing of students or for inspections, and periodic surveillance, the administration of educational or develop and update management plans, research programs. and develop and implement response (4) Any maintenance, storage, or util ity facility, including any hallway, es actions, including operations and sential to the operation of any facility maintenance, are carried out in accord described in this definition of “school ance with subpart E of this part. building” under paragraphs (1), (2), or (b) Ensure that all custodial and (3). maintenance employees are properly (5) Any portico or covered exterior trained as required by this subpart E hallway or walkway. and other applicable Federal and/or
652
NYC-WTC_000149378
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
23 shared non-person entities · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
19 shared non-person entities · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
30 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
24 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154652
Internal tracking document for managing reports, comments, and actions related to environmental compliance cases.
11 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155174
Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000108315
Transmission electron microscopy air monitoring report for asbestos analysis at townhouses, November 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000109351
October 2001 TEM air monitoring inspection report for common areas and apartments at 310 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000161139
Distribution list coordinating World Trade Center environmental response among EPA, DEC, FEMA, OSHA, CDC, and city agencies.