DRAFT EXCERPTS FROM SECTION 4:
FOR REVIEW & DISCUSSION PURPOSES ONLY
Asbestos Work Practices Used in the WTC Compiex Demoiition
The New York State Department of Environmental Conservation is delegated
responsibility for implementing all Federal regulations under the NESHAP
program. NYCDEP is responsible for the asbestos abatement program in
New York City. Even though authority to run the program in New York
was delegated to the State and local agencies, EPA retains the authority to
oversee agency performance and to enforce NESHAP regulations as
appropriate.
The NESHAP emergency requirement - - wetting damaged buildings before
demolition and continuous wetting of the debris after demolition - - appeared to
have been followed. However, implementation of work practices to reduce
asbestos emissions during transport of asbestos-containing debris appeared to be
inconsistent. The following sections describe work practices employed to reduce
asbestos emissions.
Arrangements for Demolition and Debris Removal
The New York City Department of Design and Construction (NYCDDC) was
responsible for demolition and debris removal at the site. NYCDDC retained four
construction companies to perform the demolition and debris removal. In
addition, wetting and misting operations at the site were arranged by one of the
four companies. According to New York City officials, because of file
unprecedented nature of the disaster and the work to be performed, formal written
contracts with detailed statements of the work to be performed were not prepared.
Instead, daily meetings were held to plan the day’s activities and address any
special work practices that may be required to reduce possible emissions of
asbestos.
Written NESHAP Notifications Not Prepared
EPA and New York State asbestos NESHAP regulations require that a
notification be filed even in emergency situations. The notification process
provides an opportimity for government officials to discuss and determine the
preferred work practices to be used in demolition and renovation operations.
Notification of a NESHAP demolition and removal operation was not filed for the
WTC. City officials stated that a written notification was not filed for WTC
buildings 4,5, and 6 because they were advised by the property owners that there
was no asbestos-containing material in the above ground structures. NYCDDC
officials told us that they were advised by the Port Authority that subsequent to