Spring 1998 and in Queens and Staten Island during late Summer 1998. 2,106 pit
meters have been installed in those four boroughs through July 31, 2001. Indoor
small meter contracts began work during the last quarter of 1998. 57,000 meters
were installed through May 31,2002.
Over the last few years DEP has been monitoring pilot installations of “single-jet”
type water meters, technology in common use in Europe. The single-jet technology
has two advantages over displacement, turbine and compound meter technologies:
1) smaller size, which allows meters to fit in more confined locations, and 2) fewer
parts, which suggest less of maintenance burden than compound meters. DEP has
begun installing single-jet meters as a substitute for compound meters in some
locations as of Fall 2000 and has been using them as a substitute for displacement
meters in some confined locations where displacement meters caimot fit. In these
cases an outdoor pit installation would otherwise have been the only viable
alternative, at greater cost to DEP and inconvenience to the customer. Waiting for
the delivery of single-jet meters resulted in a delay of at least several hundred and
perhaps several thousand small meters in late 2000 which were installed during the
first half of2001.
Large Residential Properties
Large meter installations have been a different story. Among the large meter
contracts that are substantially complete, the average completion rate is only 50%,
reflecting primarily a lack of cooperation from multifamily building owners.
Although perhaps 5% of the total large properties are “unmeterable” for physical
reasons, and a somewhat larger number may be delayed by the need for specialized
large meter installations in outdoor vaults, the primary barrier has been non
cooperation among multifamily residential property owners. The “first roimd” of
large meter installation contracts is complete in all community boards with the
exception of a half dozen in Brooklyn and Queens, which have relatively few large
residential properties. They were bid in mid-1999, and work began during the first
quarter of2000. “Second round” large meter contracts for the Bronx, Staten Island
and Manhattan also began work in late 2000. In addition to approximately 65,000
meters installed in multifamily buildings by DEP contractors, another 14,100 have
been installed by private plumbers throughout the city under the Reimbursable
Metering Program.