REMOVAL OF LAKE OVERFLOWS
A limited water management investigation was begim under the Lake Overflow
Investigations Task (14) of the Wards Island SSES. This investigation included
both Central Park and Van Cortland Park. Overflows from these lakes were
measured, and alternatives to remove these overflows from the Wards Island
combined sewer system were developed and evaluated. However, it was
determined that further, more detailed analyses would need to be performed in
order to reach a final recommendation.
A twenty-four month Engineer Services Contract has been awarded to
Malcolm Pimie, Inc. to expand upon these preliminary investigations. All
major waterbodies within Central Park (the Reservoir, the Pool, Harlem
Meer, the Lake, Belvedere Lake, Conservatory Pond and the Pond), and Van
Cortlandt Park (Van Cortlandt Lake and the 4 Henry Hudson lagoons) will be
studied. Drainage areas of each individual water body will be delineated,
stormwater outfalls discharging into these waterbodies will be identified,
non-point runoff sources will be investigated and City water inputs will be
determined. In addition, flow from existing wells and groundwater sources
will be identified and quantified. A Water Quality model will be developed
in order to predict water quality conditions and assist in the selection of the
most favorable alternative for the diversion of flow from the Wards Island
combined sewer system. In consultation with the Department of parks and
Recreation (NYCDPR) and the Central Park Conservancy (CPC) for Central
Park, a plan will be selected and an environmental assessment and conceptual
design of that plan will be undertaken for each park.
UPDATE AS OF JUNE 2002;
While a recommended plan for Van Cortlandt Park is agreed upon in concept,
further work has been deferred until such time as the new City administration
canbe apprised of the status of this project. NYCDPR is unable-to-
participate in funding the-Van Cortlandt-Park project at this-time; and
although NYCDEP is prepared to move forward with components of the plan
to reroute stormwater out of the collection system and to the Harlem River,
NYCDPR is withholding their consent to let DEP do work in the Park until
issues regarding the rest of the plan are resolved. The Central Park
Conservancy, the organization that is responsible for the management of
Central Park, has not approved the Central Park plan. Similar to the Van
Cortlandt Park plan, the Central Park plan will need to be reviewed by the
new administration prior to making decisions on implementation.