NYC 9/11 Public Portal Document
uISHEIl
NEW A contract to build the Arvin
Cadet physical development center at
BID/PROPOSAL DATES CAUFORWA 8/1S County of Solano, Archi
tectural Service Dept., 530 Clay St., Fair-
West Point has been awarded to J. Koko- MICIII8« 8/18 Byron Center Public field 94533, 90-bed juvenile detention
lakis Contracting Inc. Designed by Sasaki Schools, 2475 84th St., Byron Center facility at 2010 W. Texas St. in Fairfield.
Associates, the sports complex will consist 49315, two-story, 132,000-sq-ft middle $10 million. Kaplan Mcl^u^n Diaz, archi
of 110,000 sq ft of newly renovated space school and gymnasium at 84th St and tect, 222 Vallejo Si., San Francisco 94111;
combined with 350,000 sq ft of new con Homerich Ave. S.W. in Byron Center. .$17 Kilchell CRM, 2750 Gateway Oaks Dr., Suite
struction. Major elements will include million. Tower Pinkster Titzts Associates, anlii- 500, Sacramento 95855, is construction manag
multiple gymnasiums, a natatorium, teci, 678 Front Ave. N.W., Suite 255, Grand er. DR #01-887567.
weights and fitness rooms, racquet courts, Rapids 49504-5544; Owen Aznes Kimball Co.,
sports medicine-training suites, a climb 500loma Ave. N.W, Grand Rapids 49505, is CAUFORNM 9/19 University of California
ing wall, multipurpose rooms and .support amstructian manager. DR #01-655725. Santa Barbara, Design & Construction,
spaces. Completion is scheduled for mid- Facilities Management Building, 439,
2005./. Kokolakis Cmiraciing Inc., 585 Rte. PENNSYLVANIA 9/18 (separate bids)—Penn- Conference Room 130, Santa Barbara
25A, Racky Point 11778. ridge School District, District Education 93106-1030, life sciences building located
Center, 1506 N. Fifth St., Perkasie 18944, on University of California Santa Barbara
lEW YORK Bovis Lend Lease rva.s awarded Pennridge high school and middle school campus. $2.3.7 million. The four-story,
a contract by the Metropolitan Trans located at 1400 N. Fifth St. in Perkasie. 76,581-sq-ft building will house a laborato
portation Authority to provide project The estimated $47-million project consists ry, office space and classrooms. Work will
management services for pha.se 2 of the of an over 200,000-sq-ft addition and ren include the demolition of two existing
Times Square Station Complex rehabilita ovation of Upper House, a 1970s build structures. NBBJDesign, architect, 150 Sutter
tion project in New York City. Phase 2, ing, and converting to a high school. The St., Seamd Floor, San Francisco 94104-4009. DR
with an estimated construction cost of project also includes demolition work, #97-280207.
$80 million, is part of a $250-million, addition and conversion of Freshman
Much information for Pulse Is derived from F.W.
three-phase reconstruction project, which Center into a middle school, as well as a Dodge, a Division of the McGraw-Hill Companies. For
will expand and completely rehabilitate .swimming pool in Upper House and more Information on a prelect In Pulse, which has a
the rail .station complex located below asbestos abatement. Diseroei Wolff Kelly DR#, please call 1-800-FW DODGE (1-800-393-83«).
For general Information about Dodge products and
Broadway and 42nd St. Bovis Lend Lease, Clough & Bucher fnc., architect, Eight E. Broad services, call 1-800-FW DODGE or visit our Website at
200 Park Ave., New York City 10166. St., Hatfield 19440. DR #00-861879. www.twdodge.com.
P«ODI aa
LockDown Manhole MABEY Bridges Flex-Seal Utility Sealant
Security Devices Inti-Shield External Seal
■ ■
i
Flex-Seal Utility Sealant is a state of the art
plural component aromatic urethane with an
Security of the infrastnicture at the Twin MABEY pedestrian bridges, incredible 800% elongation and a tensile
Pentagon has been enhanced with the each approximately 230' in length in strength of 3200p.si Flex-Seal is designed to
installation of LockDown manhole three spans, were designed for AASH- prevent inflow/infiltration and to provide cor
security devices. These device.s can be TO loadings. The unique architectural rosion protection at the grade adjustment
installed in most water, sewer, electri systems were coordinated by The Sam ring section or joint section. Flex-Sea! Utility
Sealant provides an excellent seal and it will
cal, gas, and telecommunications Schwartz Co. The MABEY bridges
pjss a vacuum test according to ASTM stan
manholes to block unauthorized entry. were delivered to site pre-assembled dards. Infl-Sbield External Seal is made of
See www.LockDown-LockDry.com for ease of erection due to site condi a high quality EPDM rubber with a mini-
for more information or call the tions. The bridge is supported by the mum of 60 mils. It is bonded using a non-
MABEY Vertical Propping System. hardening butyl mastic with excellent adhe
LockDown-LockDry Division of sion properties. Infi-shield installs on the out
Barton Southern at 800-572-3119. side of a manhole or catch basin in minutes
and it will pass a vacuum test. _____
Barton Southern Mabey Bridge & Shore, Inc. Sealing Systems, Inc
2387 Kinmore Industrial Parkway 6770 Dorsay Road 23230 West Thomess Blvd, Loretto, MN 5S3S7
Conyers, GA 30012 Elkridge, MD 21075 Ph; (763) 478-2057 Toll Free: (800) 478-2054
Ph; (410) 379-2800 Fax: (410) 379-2801 Fax: (763) 478-8868
58 ENR/September 9, 2002
NYC-WTC_000143411
OCR can misread numbers and units. Confirm readings against the page image before using them.