NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 06/No Info.
Document / 72 pages

Illegible document fragment with reference number

Machine-extracted title · confidence 30%

Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.

NYC-WTC_000143354–000143425

Folder label: “No Info.

Page image
Scanned page image, NYC-WTC_000143405
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Enna OS UUtimate ||dlng| SQlytioci GEORGIA A contract to renovate and Highway 1 and State Rte. 98 in Wake For­ restore Packard Hall at Spelman College was awarded to Winter Construction Co. Located in .Atlanta, the $3.6-million proj­ ect includes the renovation of the 22,.500- est, N.C. Opening of the new store is expected in March 200,3. Construction of a ,30,000-sq-ft retail shopping center is under way in Clarksburg, W.V. Comple­ 'i -M^urture is^Z building sq-ft historic building to create a more tion is expected in November. John S. efficient administration complex. The Clark Co. Inc., 210 Airport Rd., Mount Airy, solution for: project will involve restoring the build- N.C. 27030 and at 4140 N. Cherry St., Ww- • disaster relief ing’s wainscot and transoms, refurbish the ston-Salem, N.C. 27115. • distribution facility windows, install new mechanical, electri­ • environmental and remediation cal and plumbing systems, and perform ILUMOIS Clayco Construction Co. was • aircraft hangars ADA upgrades throughout the facility. selected to build a three-story, 176.000-sq- • commodity storage Winter Construction Co., 1330 Spring St. A'. Wf, ft worldwide headquarters building for • exploration/extraction Atlanta 30309-2810. Anixter Inc. Developed by Catellus Devel­ • warehousing opment C^arp., the new $10-million facili­ • security inspectran .,^ GEORGIA NORTH CAROLINA-WEST VIRGINIA ty will feature a precast concrete facade John S. Clark Co. Inc. has been awarded over a structural steel frame. Located on contracts for projects in the above-men­ the Prairie Glen Corporate Campus in A- tioned states. These projects consist of a Glenview, construction on the shell was » new 10,055-sq-ft free-standing CVS/phar- under way early this summer and occu­ Lij is. macy located in Fairburn, Ga. Comple­ tion i.s scheduled for December. First Bajt- pancy is scheduled for March 2003. Clayco Construction Co., One TrawAn Plaza Or., Suite tist Church West awarded a contract for 400, Oakifrook Terrace 60lSi. its new 20,000-sq-ft multipurpose building and renovation of existing facility located ILLINOIS Novak Construction Co. was v pre engineered bulldin^^ab^' ' in Charlotte, N.C. Completion of this awarded the contract to build a new two- from stock in clear-span widths up project is scheduled for October 2003. A story, 40.000-sq-ft building for the Little to 260'. contract for the construction of a new Black Pearl Workshop at 1060 E. 47th St. • Custom designs available to meet 189,00()-sq-ft Target Store located at U.S. in Chicago. Novak Construction Co., T423 N. site requirements. Drake Ave., Chicago 60618. • Modular, mobile, shipped anywhere in the world. SpoctraPavea™ Software INDIANA A contract for a major expansion • Rapid delivery - over 2,000,000 r square feet of pre-engineered building project for Bethesda Baptist Church & Technology Paves the Way to inventory available in stock. Lower Costs, Less Risk Schools was awarded to S&B Construc­ • Full installation, design-build aaaaaaaaaaaaaaaaaaaaaaaaaaHaaaaaaisisaaaaBB^issi^^^-'r ' tion. Located on Rte. 650E north of Inter­ and project management services state 74 in Brownsburg, die project con­ Now includes the Giroud-Han Design Teclinology. available. Reduce aggregate requirements and improve sists of a new ministry and athletic center, • Lease, purchase options. subgrade performance w itli SpectraPavel. Features including a two-story gymnasium with two the industry's most advanced performance-based levels of classrooms surrounding the ath­ technology for faster, more reliable, and more letic core of the building. S&B Constmc- comprehensive analysis and design of flexible lion Co., 201 N. Illinois St., 22nd Floor, Indi­ pavements and unpaved roads. Software includes: anapolis 46204. ► NEW! Cost Analysis Module (compares various solutions) REHTUCKY Caddell Construction Co. Inc. ► Expanded! Subgrade Improvement Module ► Base Course Reinforcement Module was awarded a contract in the amount of ► Project Information Module $32,870,000 for phase 3 of the whole bar­ For your free copy, download Spectra Pave2 racks complex renewal project on a 1 fl- 5. from our web site at www.tensarcorp.com or acre site at Fort Campbell, home of the call us at 800-TENSAR-l. 101.st Airborne Division. The 258,000-sq-fl Ih -■ ib project includes a three-story barracks building which will have capacity to house approximately 400 personnel with an adja­ cent soldier community-conference facility. /I H It will also include tliree company opera­ tions buildings, a brigade headquarters NEW Giroud-Han Design Technology 1 building and a battalion headquarters.

sumtmr S T R U C T U R E S 4 O f V15 f O At COMfc'f?-4t.4. Si'ILO’NC SY STEMS IIYC Sf»®ciFat>ave2 Software la compatible witb Windows^ 9S, 9@, 31000, or NT. Completion is scheduled for May 2004. Caddell Constructim Co. Inc., P.O. Box 210099, 2700 Lagoon Park Dr., Montgomery Ala. 36109. Much Information tor Pulse Is derived from F.W. Tensar Earth Technologies, Inc, Dodge, a Division of the McGraw-Hill Companies. For www.summitstructures.com I—i—i-1 The Company You Can Build On'® more Information on a project In Pulse, which has a lOlScH . DR#, please call 1-800-FW DODGE (1-800-393-8343). H 800.615.4777 Q ©200?. Teosat Edfth fechrtoiogies, foe TtNSAR ana THE COMPANY YOU CAN BUILD ON «<» ffsgisSSfgrt tiadsma'ks Windows is a reg'Shs-Yd For general information about Dodge products and services, call 1-80Q-FW DODGE or visit our Website at iradematk of th® Microsoft Cotporahoo. !/6PH-eNRSP2SW02 www.fwdodge.com.

54 ENR/SEPTEMBER 9, 2002

NYC-WTC_000143405

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000143405Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Industry publication, December 2001 · Box DEP Box 06

NYC-WTC_000141922

McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.

32 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000143435 · Box DEP Box 06

Newspaper excerpt discussing conflicting demands for the Freedom Tower design, including office space versus symbolic height.

Filed in the same folder

Compare copies and versions →