then later after arches were repaired, workers hooked up
trolley motors for placement of the skylight system.
Glass installation started in April on the west end of
the garden and was completed by the end ofJuly. Turn
er had four trolley rigs on the job, each measuring 12 ft
deep, 25 ft wide and 10 ft in height. Thanks to a four-
point suspension system, the rigs could follow the con
tour of the roof. Each rig contained a platform that
dropped out and a small derrick equipped with suction
cups to maneuver each 400-lb
UJiDSN:;, Winter light of glass. “We would load
Garden damage was so the car in the morning and it
severe (below) that would never come down until
engineers thought It the day’s end,” says White.
not salvageable and In When it was time to move a
danger of total col- rig down the roofline to install
lapse, threatening 51- another bay of skylight, work-
stopy adjacent tower, ers would drop the rig onto the
ground, roll it to the next bay,
and hook it up to the next set
of ti'olley beams.
In the early months, the
logistics of getting equipment,
workers and materials to and
from the site hampered
progress. “The roadway.s were
blocked,” says White, and the
WTC work took precedence.
f f iBK»
as»
Turner worked closely with
the Port Authority of New York
& New Jersey, which owns the
WTC site, and the city’s Dept
of Design and Construction,
er example are the arch shoring towers. They helped support “to gain some space," says White. Using carpenters and labor
the dance floor, along with the horseshoe truss. ers, Turner even helped the city build command posts. Turn
Last but not least, the trolley system deserves the most bows er eventually found ways to get vehicles down West Street and
in die reconstruction. The inspiration for the system is that “it over to the riverside promenade alongside the Winter Garden.
took two years to glaze the roof the first time and we needed to For the redo, Turner called upon firms involved in the
do it in four and a half months.” says , I original project, even the
White. ' , . I quarry in Italy for the stone
Crews from Atlantic-Heydt *;■< I flooring. Subs were hand-
installed the 375 x 225-ft structure I picked and though most con-
up and over the Winter Garden roof I ]] 3 Ml I tracts were not competitively
last January. Beams spanning the I I bid, “we were not gouged,”
roof to shoring towers on either side f I says Brookfield’s Kanner.
were located slightly offset from | I “People were glad to have
roof arches, which align with sky- I something like this to work
I
2
light mullions.
Beam flanges became the rail for
the trolley rigs but the beams also
* •> L .• 5
I’:
re I on [and] were generous with
I time and good will. It was a
I crazy, creative group.”
I supported damaged roof arches I By virtue of the Sept. 11
8 during their restoration. In an oper- ;*<i I anniversary reopening, the
J ation that lasted from February I Winter Garden has moved from
I
I
s
fc
through April, ironworkers from .
the New York City office of C.anion
Construction Co. hung an arch off
a beam while they cut out damaged
'p3ss«S
.,
H
I I die wings to center stage in the
I public’s eye. ‘The Winter Gar-
l den represents all [that] we
I wish to embody in the de-
g segntenSg hoisted them away using I velopment across the street,”
5 a 450-ton crawler crane and welded ■!!>IK I says architect Helfand, refer-
I
q
in replacement sections.
In areas of zero arch damage, and ft* 1 ’»< HorwMimMi
(natnntiiim liH. I ring to Ground Zero proper.
I And with its new front door, she
5 ’■'a
1..
I adds, “it is a demonstration that
ilSSIW BIfilWM? ViewofWFC I we can put things back and
8 from the Hudson River Is minus make tliem better.” □
I the 110-story twin tower, One WTC. By Nadine M. Post
10 ENR/SEPTEMBER 9, 2002