NYC 9/11 Public Portal Document
Chapter 2
1 Data provided by the City of New York. 12Travel times calculated by Parsons Brinckerhoff
Quade de Douglas, Inc.
2 DRI/WEFA, Tie National Economic Im/>act of
Aviation, July 2002, p. 5. 13 Travel times calculated by Parsons Brinckerhoff
Quade de Douglas, Inc.
3 Rgures compiled by Parsons Brinckerhoff Quade
de Douglas, Inc. 14There is a possible second branch of the AirTrain
extension to and from JFK that merits further
4 Travel times calculated by Parsons Brinckerhoff exploration: extending the existing AirTrain at
Quade de Douglas, Inc. Howard Beach. This branch could extend onto
an unused portion of the viaduct currently tra
5 Metropolitan Transportation Authority, Lower versed by the A train in southeast Queens and
Maniatian Access Study, p. 2.54.
eventually connect to the Atlantic Branch via a
6 Figures compiled by Parsons Brinckerhoff Quade rebuilt tunnel entrance that exists but has been
de Douglas, Inc. sealed. This second JFK Direct scenario would
provide airport customers with another fast
7 Cost and time estimates compiled by Parsons option to JFK Airport — 22 minutes from Lower
Brinckerhoff Quade de Douglas, Inc. Manhattan to the JFK Terminals — and would
make Jamaica Express operations more flexible.
8 The Delta Water Shuttle operated hourly from
Manhattan to LaGuardia, but service was sus 15The Mayor’s Vision prices this option at $3.7 bil
pended in early 2001. lion. With escalation to account for inflation,
based on phased implementation over a 10-year
9 Travel times calculated by Parsons Brinckerhoff construction term, this figure increases to $4.7
Quade de Douglas, Inc. billion. For important information about cost
calculations for the JFK/Long Island access
lOTravel times calculated by Parsons Brinckerhoff options, please see footnote 11.
Quade de Douglas, Inc.
16 One carrier's fee is S775 to 81,250 per flight.
11 For each model in the JFK/Long Island access
section, a single methodology for estimating costs
has been consistently applied in order to allow for
comparisons between models. Cost of finandng
is not included in these estimates. By including
financing cost and utilizing different methods to
calculate contingency, phasing, and other factors, a
higher cost estimate for each model may be
obtained. In addition, to accurately accoimt for
inflation in estimating final cost, price estimates
have been adjusted based upon the length of con
struction. The Super Shuttle model has been
adjusted based on a 5-year construction term.
Endnotes 85
NYC-WTC_000143141
OCR can misread numbers and units. Confirm readings against the page image before using them.