NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 06/DEP 59.17 Junction Blvd, 11th FL
Document / 2 pages

Mass transit station reconstruction at World Trade Center, 2003

Machine-extracted title · confidence 65%

Document describing the rebuilding and reopening of transit line and stations at the World Trade Center site following September 11, 2001 damage.

NYC-WTC_000142915–000142916

Folder label: “DEP 59.17 Junction Blvd, 11th FL

Page image
Scanned page image, NYC-WTC_000142915
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I (j

News December 2003

MASS TRANSIT

/11 -Damaged Rail IIO Som Temporarily Rebuilt line and stations between New Jersey and World Trade Center signal area’s rebirth 7

‘.Hi hr Nov. 23 resumption of train service from New Jer- That modification was considered more than 20 years ago but ruled out because H sey into New York City’s former World Trade Cen- of the co.st and required service lapse, say H ter site after a $566-million overhaul of stations and officials of the Port Autliority of New York and New’Jersey, which runs PA'I'I I. .track damaged on Sept. 11, 2001, marks a crucial The reconstruction was funded by the fo milestone in lower Manhattan’s renaissance. The Federal Emergency Management Agency, Port Autliority and insurance. project’s centerpiece is a $323-niillion “temporary” The Port Authority spent $106 mil- station for thePort Authority Trans-Hud- debuted five months after the reopening hon restoring 1-mile-long tunnels below son (PATII) line in New York City that of the Exchange Place station across the the river that suffered major flood dam­ will serve as a no-frills stand-in for the $2- Hudson River in Jersey City', N.J. That age after the 9/11 terror attacks. “Tunnels billion downtown transportation mega- station undenvent $1.17 million of work, were flooded up to roof height,’’ says Lou center to come by the end of the decade. I including the llO-ft extension of plat- .Menno, a manager of die Port AuAori- The station opened a month early and I forms to accommodate 10-car trains. ty’s priority capita! program. Water from seepage and firefighting also lorWTr l« *..... 1 e destroyed many of the foO

a'

/it Tj 7T E cables and 4,400 wires inside. The PATH system consists of five tunnel extensions of varying elevations shaped like a hand. It needed major work dt to repair timnel linings and to at Tracks I g-racAg'"' accommodate trains that were >V\i

* ill r ITS) rerouted from Exchange Place to another Manhattan PATH .station. Track, electrical equip­ G I ment and ducts were replaced -vl and the Port Authority spent 4 more than S16 million on nev track signals and S2 million on a new computer-run switch­ 5> ing center that replaces the old relay system. z...-akw i It took weeks after 9/11 w A Rebirth. Temporary PATH station at World Trade Center was opened after $323-million reconstruction. pump out the water, says Tbii 10 ■ ENR ■ December 1. 2003 r

NYC-WTC_000142915

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000142915Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →