Procedure for roof cleaning of asbestos contaminated material (ACM)

Machine-extracted title · confidence 90%

Standard operating procedure detailing decontamination pads, worker attire, and hygiene protocols for cleaning roofs with ACM.

NYC-WTC_000141447

Folder label: “'$ Matrix, etc See FEMA

Page image
Scanned page image, NYC-WTC_000141447
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Roof Clean-Up

Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs contaminated with asbestos containing material (ACM).

1. The entire roof shall be considered the work area. All abatement will be performed by hT/SDOL licensed contractors with NYC DEP certified workers.

2. A changing area consisting of two adjacent step-off pads located on the roof immedia'ely adjoining the roof entrance/exit. This area shall consist of a clean pad and a c’ ange pad. The clean pad shall be adjacent to die building interior access way (or at the point of entiy to the roof for exterior access). The change pad shall be adjacent to the contaminated roof areas. Each pad (change pad and clean pad) shall consist of two layers of 10- mil reinforced plastic on the root/access vay surface and shall be large enough to faciliute changing and decontamination as described herein. A minimum of 4’ x 4’ is recommend, though the exact configuration will be specific to the roof.

3. Workers shall first step from the building interior (or exterior at the point of entry to the roof) directly onto the clean pad. On Cie .lean pad, each worker shall be double suited with dispos'ble coveralls, plastic booties, gloves, and head coverings. Rubb er boots may be used instead of the plastic booties. Tht boots shall be wet wiped and HEPA vacuumed pri jr to leaving '‘he roof. Each worker shall v ear a minimum of a half-face air­ purifying respirator equipped ’ /ith HEPA cartridges.

4. All penetrations at the roof shall be cleaned by wet methods/HEPA vacuum and sealed with polyethylene sheeting.

5. Roof cleanup shall begin at the entrance/exit and proceed in a path working away from the entrance/exit. Water shall be the primary engineering control to minimize the potential for fiber release.

6. Roof surfaces shall be wetted and then wet cleaned using wet wiping techniques with water, mops, rags, brushes, etc. HEPA vacuuming may also be used as alternative to or in combination with wet cleaning.

7. Throughout' the procedure, all personnel entering or existing the roof shall observe the personal decontamination practices. Attention shall be paid to limiting unnecessary walking on or disturbance of material on the roof. These personal decontamination procedures shall be adhered to strictly in order to minimize the pclential for spreading contamination to the interior of the bnildings.

8. Solid nonporous objects, such as meta! patio furniture, plant potters, 'md plastic furniture cushions, shall be wet wiped with damp rags. Wooden objects such as decking shall be HEPA vacuumed, wet wiped, and lightly brushed with a bristle brush utilizing simultaneous misting and local HEPA exhaust Woven materials shall either be disposed as ACM or bagged and removed off-site for proper laundering in accordance with 29 CFR 1901. 1001. Pc.ted plants with visual contamination should be disposed as ACM waste unless the owner requests decontamination. Potted plants will be repeatedly rinsed, and provisions shall be made to catch the runoff water (i.e. into ACM dispos^ bags or by using rags and HEPA wet-vacuums).

9. After compbtion of the above, the entire roof shall be carefully washed.

10. Air Monitoring shall be performed h” NYSDOL licensed a Third Party Air Monitoring firm with certified workers. The Third Party Air n.unitoring firm shall perform a visual inspection to confirm the absence of ACM or debris after the areas are completely dry. Clearance air monitoring shall not be required if all samples collected during the work were found to be below 70 s/mm^.

Febn«iy27.2002

NYC-WTC_000141447

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000141447Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000141129 · Box DEP Box 05

Notice from the New York City Law Department regarding the preservation of World Trade Center documents for legal actions.

Filed in the same folder

NYC-WTC_000141130 · Box DEP Box 05

Invoice listing contractor Warren & Panzer for dust cleaning services with amounts and dates from October to November 2001.

Filed in the same folder

NYC-WTC_000141131 · Box DEP Box 05

Invoice listing contractor Warren & Panzer for dust cleaning services with amounts and dates from October to November 2001.

Filed in the same folder

NYC-WTC_000141132 · Box DEP Box 05

Contract details for a vendor providing indoor air dust cleaning services at the World Trade Center site from May 2002 to May 2003.

Filed in the same folder

Compare copies and versions →