Catanzaro, Enzo
From: Smyth, Virginia
Sent: Tuesday, October 16,2001 3:42 PM
To: Catanzaro, Enzo
Cc: gilsennan, michael (ex)
Subject: Air Monitoring Contract
Importance: High
The following is a summary of what we need to supply for the Dedaration of Emergency.
1. Complete list of Bidders contacted.
2. List and/or copies of the bids received .(bid sheet)
3. Rational of how the low bidder was selected.
4. A detailed Scope of Wwk (to be included in the formal contract.)
5. Estimated Time Frame (mandatory)
I
6. Estimated total cost (mandatory)
A judification of why this is critical, and under what authority it is being performed.
]
1
NYC-WTC_000140573
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000140573Source: NYC Law Department, mirrored locally
Documentation of bids from multiple laboratories for daily air sampling and TEM analysis at World Trade Center vicinity locations, with vendor selection based on price and…
1 shared topics · Same agency, volume and box · similarity 0.919
Documentation of bids from multiple laboratories for daily air sampling and TEM analysis at World Trade Center vicinity locations, with vendor selection based on price and…