NYC 9/11 Public Portal Document
10. Owner/residents may identify and tag certain furnishings (e.g. carpets and fabric covered
furniture) for disposal rather than cleaning. Disposal of residents’ personal property shall not
occur without prior written authorization by the owner.
11. Disposal of all wastes generated during the cleaning shall be the responsibility of the
contractor. All waste generated shall be treated as asbestos-containing material (ACM).
Transportation and disposal of generated waste shall be in compliance with all applicable rules
and regulations.
12. If mold or peeling, flaking or chalking paint is observed in the work area, the cleaning
contractor shall immediately contact the Monitoring Contractor.
13. If in-place materials suspected to contain asbestos are observed the Cleaning Contractor shall
immediately notify the Monitoring Contractor. The Monitoring Contractor will evaluate the
condition of the material to identify damaged, deterioration, delamination, etc. The Cleaning
Contractor shall wrap suspect ACM that is in good or excellent condition with 6-mil
polyethylene sheeting and seal airtight with duct tape or equivalent method prior to cleaning or
air monitoring.
14. In the event that damaged, deteriorated, delaminated, etc. suspected ACM is observed, the
Cleaning Contractor will notify the Monitoring Contractor. Cleaning or air monitoring will not
proceed in areas where such suspected ACM is observed until instructed otherwise.
7
NYC-WTC_000140449
OCR can misread numbers and units. Confirm readings against the page image before using them.